Page 4
ELECTRICAL REQUIREMENTS
CAUTION -
The brewer must be disconnected from the power source until specified in
Initial Set-Up.
120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.
Proceed as follows:
Electrical Hook-Up
CAUTION –
Improper electrical installation will damage electronic components.
1.
An electrician must provide electrical service as specified.
2.
Using a voltmeter, check the voltage at the electrical source.
3.
Connect the brewer to the power source.
4.
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for
Initial Set-Up.
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90
psi (620 kPa) from a
1
⁄
2
" or larger supply line. A shut-off valve should be installed in the line before the brewer.
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The
water inlet fitting is
1
⁄
4
" flare.
NOTE -
Bunn-O-Matic recommends
1
⁄
4
" copper tubing for installations of less than 25 feet and
3
⁄
8
" for more than
25 feet from the
1
⁄
2
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the
brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the
brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the
Building Officials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
29460 061599
Содержание TU3Q-EZ
Страница 22: ...Page 22 29460 082300...