
Bunn-O-Matic Corporation
5
Electrical Install
An electrician must provide electrical service as specified in conformance with all local, state, and federal electrical
codes.
Step 1:
Plug brewer into the power source.
Initial Start-Up
Step 1:
Place the main power switch into the On position.
When the machine is turned on, it will begin to fill the tank.
After the tank fills the machine will automatically begin the heating cycle. This will take approximately 20 minutes.
Once the water temperature has reached the programmed Brew Lockout temperature it will display the ready screen.
The machine will continue to heat until it reaches its programmed shut-off temperature.
PLEASE WAIT
TANK FILLING
HEATING
WATER TEMP XXXXº
READY TO BREW
WATER TEMP: 205º