background image

Page 33

PROGRAMMING THE BREWER (cont.)

Procedure to test components (outputs):

1.  Place brew funnels into rails on both sides of 

brewer.

2.  Place a server beneath each brew funnel.

3.  Press and hold the upper right hidden switch until 

display reads UNITS. Release the switch. Continue 

to press and release switch until SERVICE TOOLS 

appears.

4. Press YES to run tests on various components 

and outputs within the brewer. Pressing NO will 

exit this function and advance to the next function 

screen.

5.  The display should read TEST OUTPUTS.

6.  Press and release YES. The display should read 

LEFT BREW VALVE.

7.  To test LEFT BREW VALVE, press ON. If the brew 

valve is functional, water should run from the left 

brew side.

8. Press OFF to end flow of water.

9. Press NEXT to advance to the next component to 

be tested.

FUNNEL DETECT (optional)

  This function allows the operator to prevent the 

start of a brew cycle if a Smart Funnel is not positioned 

correctly in the funnel rails.

Procedure to set funnel detect:

1.  Press and hold the upper right hidden switch until 

display reads UNITS. Release the switch. Continue 

to press and release switch until display reads 

FUNNEL DETECT.

2.  NO or YES should be flashing to indicate the cur-

rent setting.

4. Select YES to prevent brewing if a Smart Funnel is 

not correctly situated in the rails.  If this function 

is activated and a brew cycle is attempted with the 

funnel not properly situated, the display will read,  

FUNNEL NOT IN PLACE, until one is in place.

5. Select NO to allow brewing without a Smart Fun-

nel in place. This is selected when brewing with a 

funnel other than a Smart Funnel (a regular brew 

funnel).

6.  When finished, press and release DONE. This will 

retain the changes, exit this function screen and 

advance to the next. Another alternative is to press 

the ON/OFF switch (either on DUAL brewers) lo-

cated on the front switch panel to exit the FUNNEL 

DETECT and return to the MAIN SCREEN.

FUNNEL DETECT ?

 NO 

DONE 

YES

SERVICE TOOLS

 

This function allows the testing of individual com-

ponents and the ability to check switches for proper 

function. This function also tests the Soft Heat server's 

status on the brewer (in place or removed), and the 

funnel sensor coil's frequency (diagnostic tool for 

troubleshooting purposes only).

Testing individual components (outputs):

  This will allow the operator to test the operation 

of individual components and outputs of the brewer.  

The components that can be individually tested are as 

follows:

DUAL Brewers 

Left Brew Valve

Left Bypass Valve

Left Funnel Lock

Right Brew Valve

Right Bypass Valve

Right Funnel Lock

Refill Valve

Tank Heaters

Heater Contactor

SINGLE Brewers

Brew Valve

Bypass Valve

Funnel Lock (Optional)

Refill Valve

Tank Heaters

Heater Contactor

41342 080108

Содержание DUAL SH DBC WITH SMART FUNNEL DUAL068000

Страница 1: ...DBC W SMART FUNNEL S N DUAL068000 UP PROGRAMMING MANUAL BUNN O MATIC CORPORATION POST OFFICE BOX 3227 SPRINGFIELD ILLINOIS 62708 3227 PHONE 217 529 6601 FAX 217 529 6644 41342 0000C 4 12 2008 Bunn O...

Страница 2: ...ons to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied...

Страница 3: ...30 Calibrate Sprayhead Flow 30 Calibrate Bypass Flow 31 Brew Counters View Reset 32 Funnel Detect 33 Service Tools 33 Test Outputs Components 33 Test Switches 34 Test Frequency 34 Factory Defaults Re...

Страница 4: ...into the funnel and allows for the brewer to automatically set itself to what is read from the funnel handle LAST ON TIME During a pulse brew this is the time set for the second on time and each alte...

Страница 5: ...tches are used There are five of these switches that will be used for the setup of the brewer 1 2 3 4 5 1 symbol upper right of the BUNN logo This is used to access the programming mode and is also us...

Страница 6: ...s function screen and return to the MAIN SCREEN on the display PROGRAMMING THE BREWER The programming of the brewer is divided into two levels There is one function in Level 1 All other functions are...

Страница 7: ...REINFUSION TIMES and DRIP OUT TIMES METHOD 3 Not using a Smart Funnel and or a G9 2T DBC or MHG Grinder This allows the operator to enter ONE set of brew ing parameters for each side on DUAL brewers i...

Страница 8: ...CIPE COPY SETTINGS NO YES LEFT RIGHT NO YES Continue to D Cycles thru left side program constants Continue to E FULL 1 2 1 4 SET ALL 3 BATCHES both sides for DUAL brewers ARE YOU SURE NO YES 3 BATCHES...

Страница 9: ...ES DONE NO YES 1st OFF LAST X XX X XX X XX TRANSFER COMPLETE ENABLE ADS NO DONE YES SET TEMP 200 F DONE SET READY 195 F DONE 0 REFILL 155 DONE L SPRY OZ M XX X DONE R SPRY OZ M XX X DONE Continue to F...

Страница 10: ...N NEXT OFF RIGHT BREW VALVE ON NEXT OFF RIGHT BYPASS ON NEXT OFF RIGHT FUNEL LOCK ON NEXT OFF REFILL VALVE ON NEXT OFF HEATER CONTACTOR ON NEXT OFF SPRAY HEAD CAL NO YES BYPASS CAL NO YES CONTAINER RD...

Страница 11: ...onstoredelsewhere so that the machine can be reprogrammed Procedure for modifying units of measure 1 Press and hold upper right hidden switch until the display reads UNITS Release switch Press and rel...

Страница 12: ...6 If YES was selected the display should now read X X HRS IDLE This screen allows the opera tor to set the amount of time the brewer is not in use before nap mode engages Using and adjust the idle ti...

Страница 13: ...ndividually to provide optimum brewing quality P2415 BREW OZ XX X DONE BYPASS XX X DONE 3 BATCHES DONE NO YES PROGRAMMING THE BREWER cont DUAL BREWERS only Procedure for Setting the Recipe NOTE Before...

Страница 14: ...METHOD 17 If setting pulse brew by MANUAL METHOD en tering known times press MANUAL then NEXT and proceed with the setup instructions for SET PULSE BREW MANUAL METHOD SET DRIP TIME Refer to SET DRIP...

Страница 15: ...ion the RECIPE CARD vertically so that the top end of the CHIP is beneath the left side funnel sensing coil 3 AfterashortpausethedisplaywillreadCARDCON TAINS RECIPE FOR then will change to COFFEE NAME...

Страница 16: ...rwillperform in the same capacity as a standard Bunn Single Dual Brewer The instructions for programming the NO NAME settings are on the following pages The same steps are followed for setting the rec...

Страница 17: ...all the brew settings for that particular coffeename Whenfinished thedisplaywillreturn to the coffee name just viewed 4 To see settings again press SHOW To advance to the next coffee name press NEXT 5...

Страница 18: ...essanotherbatchsizeandrepeat step 5 for that size for each batch size to be modi fied Continue setting all batch sizes 7 When finished setting all batch sizes press and release DONE The display should...

Страница 19: ...l be blinking Press and release the batch size to be modified 7 Using and set the amount of bypass water percentage to be dispensed around the grounds for that particular batch size 8 Whenfinished pre...

Страница 20: ...LTERNATES UNTIL BREW CYCLE IS COMPLETED PRE INFUSION REMAINING ON ON TIME OFF TIME OFF TIME OFF TIME OFF TIME ON TIME ON TIME Modifying pulse brew Range 1st on time off to 4 minutes Off time off to 4...

Страница 21: ...ME MODIFY SHOW NEXT THAT WAS THE LAST RECIPE WHEN THE LAST COFFEE NAME IN BREWER S MEMORY IS DISPLAYED PRESSING NEXT WILL EXIT AND THE DISPLAY WILL THEN READ ADVANCES TO ALL OTHER COFFEE NAMES PROGRAM...

Страница 22: ...the indicator light Repeat step 2 for each batch size to be set 4 When finished setting all batch sizes press done This will display the 1st OFF and LAST times for 5 seconds then advance to 3 BATCHES...

Страница 23: ...aywillshow thethreetimesjustenteredforthatbatchsize After a 5 second delay the display will read 3 BATCHES DONE 8 If other batch sizes need to be modified press NO 9 Press a different batch size and r...

Страница 24: ...A batch light should also be blinking 10 Using the and set the amount of time from when the brew solenoid shuts off to when drip out occurs for that batch size NOTE Set to OFF to prevent funnel locks...

Страница 25: ...leasetheswitch Con tinue to press and release switch until the display reads COPY SETTINGS ASSIGN RECIPES This function allows for assigning a coffee name other than NO NAME to the BREW switch Procedu...

Страница 26: ...ewer with an AD CARD This message will be displayed when the brewer is not in use Procedure to Enable Disable Ads 1 Press and hold upper right hidden switch until the display reads UNITS Release switc...

Страница 27: ...idden switch until the display reads UNITS Release switch Continue to press and release switch until the display reads SET READY 2 To adjust the ready temperature press the button to decrease or to in...

Страница 28: ...OFF switch located on the front switch panel to exit R SPRY OZ M function and return to the MAIN SCREEN SPRAY OZ M SINGLE BREWERS Thisfunctionallowstheoperatortoviewortoenter the actual flow rate comi...

Страница 29: ...IN SCREEN BYPASS OZ M DUAL BREWERS Thisfunctionallowstheoperatortoviewortoenter the actual flow rate coming out of the bypass nozzle This is NOT used to change the actual flow rate but to telltheinter...

Страница 30: ...SEC TO FIN ISH The 60 second timer on the display will count down to zero When the counter reaches zero the display will change to ENTER OZ along with a number signifying ounces per minute 6 Measure...

Страница 31: ...When the counter reaches zero the display will change to ENTER OZ SINGLE brewers LEFT or RIGHT OZ DUAL brewers along with a number 7 Measure the amount of water in the container and using or adjust t...

Страница 32: ...st reset BREW COUNTERS NO YES LEFT X XXX NEXT RESET SINGLE BREWERS DUAL BREWERS RIGHT X XXX NEXT RESET L R X XXX NEXT RESET L R X XXX NEXT X XXX NEXT RESET X XXX NEXT EXIT TO NEXT FUNCTION SCREEN 3 To...

Страница 33: ...not correctly situated in the rails If this function is activated and a brew cycle is attempted with the funnel not properly situated the display will read FUNNEL NOT IN PLACE until one is in place 5...

Страница 34: ...e MAIN SCREEN Procedure to test switches Thisfunctionallowstheoperatortotesttheopera tion of the individual switches on the front panel 1 Place brew funnel s into rails on the brewer both sides on DUA...

Страница 35: ...TANK HEATRS ON NEXT OFF HEATER CONTACTOR ON NEXT OFF BREW VALVE ON NEXT OFF BYPASS ON NEXT OFF FUNNEL LOCK ON NEXT OFF SINGLE BREWERS DUAL BREWERS EXIT TO NEXT FUNCTION SCREEN TEST SWITCHES NO YES NOT...

Страница 36: ...and ad messages Factory set default values will replace all previous settings EXIT EXIT REPLACE WILL REPLACE ALL BREW SETTINGS ARE YOU SURE NO YES FACTORY DEFAULTS NO YES ThermoF SoftHeat DONE SEL BRE...

Отзывы: