Bunn CDBC Скачать руководство пользователя страница 4

Page 4

ELECTRICAL REQUIREMENTS

CAUTION - 

The brewer must be disconnected from the power source until specified in 

Initial Set-Up.

Electrical Hook-Up
CAUTION –

Improper electrical installation will damage electronic components.

1.

An electrician must provide electrical service as specified.

2.

Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.

Remove the front panel beneath the sprayhead.

4.

Feed the cord through the strain relief and connect it to the terminal block.

5.

Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
Replace the front panel.

6.

If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 5 and 90 psi  (34.5

and 620 kPa)  for CDBC  models and 20 and 90 psi  (138 and 620 kPa) for CEZ models from a 

1

2

" or larger supply

line.  A shut-off valve should be installed in the line before the brewer.  Install a regulator in the line when pressure
is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa).  The water inlet fitting is 

3

8

" flare.  Bunn-O-Matic

does not recommend the use of a reverse-osmosis or deionized water supply to this equipment.

NOTE - 

Bunn-O-Matic recommends 

3

8

" copper tubing from a 

1

2

" or larger water supply line.  A tight coil of copper

tubing in the water line will facilitate moving the brewer to clean the countertop.  Bunn-O-Matic does not
recommend the use of a saddle valve to install the brewer.  The size and shape of the hole made in the supply line
by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the

Building Officials and Code Administrators International, Inc. (BOCA)

and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

Plumbing Hook-Up

1.

Flush the water line.

2.

Securely attach it to the flare fitting at the rear of the brewer.

3.

Turn on the water supply.

One circuit models require one 3-wire, grounded service rated 120/208

or 120/240 volts ac, 40 amp, single phase, 60 Hz.

Two circuit models require two 3-wire, grounded service rated 120/208

or 120/240 volts ac, 20 amp, single phase, 60 Hz.

Proceed as follows:

NEUTRAL

WHITE

L1 BLACK

208 or 240V.A.C.

120V.A.C.

120V.A.C.

L2 RED

29319 091203

Содержание CDBC

Страница 1: ...FUN NE L CO NTE NTS AR E HO T CA UT IO N DIS CA RD DE CA NTE R IF CRA CKE D SCR ATC HED BOI LED DRY HEA TED WHE N EMP TY USE D ON HIG H FLA ME OR EXP OSE D ELE CTR IC ELE MEN TS FAI LUR E TO CO MP LY...

Страница 2: ...y claim to be made under this warranty by telephone at 217 529 6601 or by writing to Post Office Box 3227 Springfield Illinois 62708 3227 2 if requested by BUNN shipping the defective equipment prepai...

Страница 3: ...00656 0000 00658 0000 12364 0000 10044 0000 WARNING DO NOT OVERLOAD CIRCUIT ALWAYS ELECTRICALLY GROUND THE CHASSIS OR ADAPTOR PLUG DO NOT DEFORM PLUG OR CORD FOLLOW NATIONAL AND LOCAL ELECTRICAL CODE...

Страница 4: ...stall a regulator in the line when pressure is greater than 90 psi 620 kPa to reduce it to 50 psi 345 kPa The water inlet fitting is 3 8 flare Bunn O Matic does not recommend the use of a reverse osmo...

Страница 5: ...te and complete a brew cycle ADDITIONAL WARMER SWITCHES Placing any additional warmer switch in the ON upper position supplies power to the associated warmer READY INDICATOR This indicator glows when...

Страница 6: ...ethandle Releaseitwhenyouhearwateronceagainflowing into the tank 8 Model CDBC With the ON OFF switch still in the ON position indicator glowing momentarily press and release the BREW switch Model CEZ...

Страница 7: ...erisnowsettodispensethisamount of water for each subsequent brew cycle To increase the amount of water for each brew cycle place an empty funnel in the funnel rails and an empty decanter or graduated...

Страница 8: ...isfactorysetwiththebrewlockoutdisabled Brewlockoutpreventsstartingabrewcycleiftheready indicator is not glowing When an attempt at brewing cannot be allowed the word NOT and LOCKOUT flash for three se...

Страница 9: ...lease the BREW switch once for each ounce approximate of water to be added to the prior setting and allow the brew cycle to finish To decrease the amount of water for each brew cycle place an empty fu...

Страница 10: ...emory The spray will continue the off and on cyclesuntilthebrewvolumeofstep1iscomplete PressingtheOFF ONbuttonagainwillterminatethebrewing cycle with the parameters stored in memory 7 If only a preinf...

Страница 11: ...notices Before troubleshooting this brewer check for the following A Control Boards CDBC TWIN 1 Make sure ribbon cable is properly attached to the control board ALL PINS INSERTED INTO PLUG 2 Makesure...

Страница 12: ...check for lime deposit on tip Clean and rein stall Disconnect the brewer from the power source and remove wires from refill valve coil Check for con tinuity across the terminals of the solenoid coil I...

Страница 13: ...ctor from the control board Check for continuity from the nut on top of the level probe to pin 5 of the plug continuity should be present Pullthetemperatureprobe up about an inch from the grom met Che...

Страница 14: ...e up about an inch from the grommet Check for continuity from the outside surface of the temperature probe and pin 4 of the plug continuity should be present Connect the J3 plug to the control board a...

Страница 15: ...probe from the grommetandsubmergeinawater bathofapproximately70 F 21 C Connect an ohmmeter to pins 2 and 3 of the J5 connector At 60 F 16 C the reading should be 15 3k 2k OHMS at 70 F 21 C the readin...

Страница 16: ...board B Remove the probe from the grommetandsubmergeinawater bathofapproximately70 F 21 C Connect an ohmmeter to pins 2 and 3 of the J5 connector At 60 F 16 C the reading should be 15 3k 2k OHMS at 7...

Страница 17: ...ss the black and white terminals at the termi nal block The indicator lamp must be lit Allow brewer to heat until ready lamp is lit or disable the brew lockout feature See page 7 or 8 Press ON OFF swi...

Страница 18: ...inuity across the terminals of the sole noid coil If continuity is not present replace the solenoid See page 27 If continuity is present the valve may be stuck closed Set up brewer according to in str...

Страница 19: ...for proper ex traction Place an empty brew funnel on an empty decanter beneath the sprayhead Initiate brew cycle and check the water temperature im mediately below the sprayhead with a thermometer The...

Страница 20: ...t the brewer from the powersource Removethewarmer plate and turn upside down to ex pose the warmer terminals Re move the two wires Check for continuity across the two warmer terminals If continuity is...

Страница 21: ...pressure is water shut off Level probe dry for 7 minutes after fill valve is energized Shorting pin on J6 connector of control board not on correct set of pins CEZ boards only See page 7 Level probe w...

Страница 22: ...sistance in determining the cause of any problem WARNING Inspection testing and repair of electri cal equipment should be performed only by qualified service personnel The brewer should be unplugged w...

Страница 23: ...and Replacement 1 Disconnect the black wire and blue wire from the relay on the control board 2 Disconnect the 10 pin connector and the 4 pin connector from the main wiring harness 3 Disconnect the 1...

Страница 24: ...Remove the four 6 32 screws securing the con trol board to the component mounting bracket 5 Remove the four spacers from the control board and attach them to the new board 6 Locate J6 connector on con...

Страница 25: ...CH PANELS CDBC Removal and Replacement 1 Disconnect the 11 pin connector to the switch panel from the control board 2 Remove the four 6 screws nylon washers and the two 4 screws securing the control b...

Страница 26: ...described refer to the Wiring Diagrams and check the brewer wiring har ness 5 With the black wire removed remove the wire from the lower terminal 6 Check for continuity across the center and lower ter...

Страница 27: ...Check for continuity across the two terminals on the switch when it is held in the lower position Continuity must not be present across these ter minals when the switch is released P1851 P1849 FIG 7 B...

Страница 28: ...or wear and remove waterborne particles If the sound is not heard as described proceed to 6 P1877 P1853 WHI GRN from PC Control Board WHI from Terminal Block FIG 10 DISPENSE VALVE WIRING FIG 9 DISPENS...

Страница 29: ...el on the front side of the tanks Test Procedures 1 Disconnect the brewer from the power source 2 Disconnect the blue and black wires from the limit thermostat 3 Withanohmmeter checkforcontinuityacros...

Страница 30: ...hose from the top of the tank by pulling the elbow fitting from the grommet in the top of the tank lid 3 Drain water from the tank 4 Disconnect the water supply tube to the dispense valve from the si...

Страница 31: ...the grom met in the tank lid 24 Install the elbow fitting of the vent hose into the grommet in the tank lid 25 If installing left tank on brewers with faucet connect the outlet water line of the fauce...

Страница 32: ...continuity is not present as described replace the refill valve 6 Check the refill valve for coil action Connect the brewer to the power source With ON OFF switch in the ON upper position press start...

Страница 33: ...4 Disconnect the brewer from the power source If voltage is present as described proceed to 5 If voltage is not present as described refer to Wiring Diagrams and check brewer wiring harness 5 Check th...

Страница 34: ...YEL WHI YEL WHI ORA WHI ORA PNK WHI GRN COUNTER OPTIONAL PNK GRY t BLK BLK 14 WHI 120 208V AC 3 WIRE 120 240V AC 3 WIRE SINGLE PHASE P1 P2 P3 ARE PINS OF A POLARIZED THREE PIN CONNECTOR WHI SOL WHI W...

Страница 35: ...IRE SINGLE PHASE 120 208V AC 3 WIRE 120 240V AC 3 WIRE SINGLE PHASE YEL WHI VIO WHI VIO WHI VIO BLK WHI YEL YEL W H I LEFT CONTROL PANEL ASSY J2 1 J2 6 J2 11 BREW SW STATIC SHIELD ON OFF SW HIDDEN SW...

Страница 36: ...OPTIONAL 120 208V AC 3 WIRE 120 240V AC 3 WIRE SINGLE PHASE 120 208V AC 3 WIRE 120 240V AC 3 WIRE SINGLE PHASE VIO VIO BLK WHI LEFT CONTROL PANEL ASSY J2 1 J2 6 J2 11 BREW SW STATIC SHIELD ON OFF SW...

Отзывы: