4  UNPACKING 

Remove packing materials and lift out machine complete with baseboard. Remove 4 
securing bolts that secures machine to baseboard 

4.1  Installation 

 

Open cover 

 

Remove the shipping strap from the cutting head and push the cutting lever to the rear to raise the cutting 
Wheel as high as possible. 

 

Install the cutter on suitable table and secure alignment by means of adjusting positions of 4 secure 
leveling bolts.  

 

Plug to mains 380-400V (3 phase) power and check the turning position of cutter and ensure correct 
turning if necessary. 

4.2  Installation Commissioning  

Check the machine's electrical connection is made before the electrical diagram. The machine needed to 
make the detection of the voltage and frequency. After making this determination, the machine outlet is 
provided in a suitable location with Make a connection to the required fixing. Under normal conditions, the 
machine380-400V / 50-60Hz (3P + N + GND) to work with. Make sure the grounding.  
IMPORTANT: Electrical connection is made, then check the rotational direction of cooling the engine and 
cut the engine and changing the location of phase reversal Provide status 2. IMPORTANT: All electrical 
work and electrical maintenance, repair and so on. By competent and qualified electrician to make your jobs. 

4.3  Plumbing 

 

Locate recirculation pump on its table and bring it to the near of cutter. 

 

Make recirculation pump electrical connections Connect 18 mm coolant supply hose to the rear of cutter 
and tighten the hose clamp. Locate the other end to recirculation pump and tighten the hose clamp. 

 

Connect the 40 mm dia coolant return hose to rear of cutter and clip the hose clamp. Locate other end of 
hose on filter of reservoir tank. 

 

Fill the reservoir tank with water (55 liter) and %5 (2 liter) of cutting fluid. Locate top cover on tank. 

Open the cover of cutter and press PUMP button and allow pump to run a few minutes. This procedure 
ensures adequate mixing of coolant solution. (PUMP button is not used when the cover is closed.) 

COOLANT 
RESERVOIR TANK 

TOP 

COVER    

 

RECIRCULATION PUMP

 

FILTER 

WATER HOSE INLET 
(COOLANT HOSE 

FROM PUMP) 

FILL THE RESERVOIR TANK WITH WATER (55 

LITER) AND %5 (2 LITER) OF CUTTING FLUID. 
LOCATE TOP COVER ON TANK. 

WATER HOSE EXIT 

(COOLANT HOSE TO RESERVOIR) 

LEVELING BOLT 

Содержание BULUCUT-4

Страница 1: ...t Makina Sanayi Ve Ticaret Ltd ti kitelli Organize Sanayi B lgesi Dolapdere Sanayi Sitesi Ada 4 No 7 9 Ba ak ehir STANBUL Tel 0 212 671 02 24 25 Fax 0 212 671 02 26 Web site www bulutmak com e mail bm...

Страница 2: ...TING DRIVE INSTALLATION 7 4 5 TO CHANGE THE LAMP 7 5 CARE INSTRUCTIONS 7 5 1 PERIODIC CHECKS AND MAINTENANCE IMPORTANT 7 5 2 DAILY CONTROL AND TREATMENTS IMPORTANT 7 6 CUTTING FLUID MANUAL 7 6 1 FIRST...

Страница 3: ...ated vises for holding samples All inside parts made from stainless steel or chromium plated steel Splash proof during cutting Cooling by two high flow water jets to provide optimum cutting Cutting ac...

Страница 4: ...ENCY 3 MAIN PICTURE pic 1 The main picture pic 2 Functions of the buttons SEE THROUGH HOOD STEEL TOP COVER LEVELLING BOLT PUMP MAINS HANDLE TO OPEN COVER CUTTING LEVER LAMP STOP START POSITION LOCKING...

Страница 5: ...OOLANT HOSE TO RESERVOIR WATER HOSE INLET WHEEL GUARD JAW COOLANT PIPE CLAMPING UNIT MOVING CLAMP SHAFT MOTOR HOUSING BOLTS FOR FIXING CLAMPING UNIT ON TABLE SLIDINGT TABLE FOR FIXING CLAMPING DEVICE...

Страница 6: ...eck the rotational direction of cooling the engine and cut the engine and changing the location of phase reversal Provide status 2 IMPORTANT All electrical work and electrical maintenance repair and s...

Страница 7: ...uthorized persons After the cleaning process is completely finished all the fluid control valves bolt connections should be checked 5 2 Daily Control and Treatments IMPORTANT Use Device cleaning out t...

Страница 8: ...ient of 1 4 according to the fluid should be considered canceled Refractometer with the rate control the machine should be made at the level of the liquid tank is full 7 INSTRUCTION 7 1 Sample Fixing...

Отзывы: