
BULTEH 2000 Ltd.
Industrial Area 19, STARA ZAGORATel./Fax:(359 42) 6260 19, 603 449; Tel. (359 888) 714 711;
9
Power cable must pass through the
fitting
of the electric cabinet installed in the
plant
(
pic.4/pos.1
), and fitting on the rear center column of the unit - when
transported this fitting is removed and attached on the inside of the column
(
pic.5/pos.1
).
pic.4
pic.5
After mounting the power cable the plant grounding must be done,
according to the standards of the user country.
Fitness of the grounding must be periodically checked by an
authorized specialist or a specialized organization, according to the
standards of the user country.
3.4 Diagram of waste water drainage from upper board:
(
pic.6/pos.1
), (
pic.7/pos.1
)
For draining water obtained as a result of condensation in heating milk product
or cleaning the upper board it is provided with a fitting hole on the bottom side. A
pipe is mounted at the fitting through which this water is drained into the drains
system.
от горен
4.
TECHNICAL DESCRIPTION OF THE PLANT:
4.1 Purpose and area of application:
The Plant is designed for processing of up to 120L of dairy products.
Function of the plant includes :
4.1.1 Automatic or manual processing of dairy products:
Automatic or manual processing of dairy products through thermal cycles of
heating and cooling, pasteurization and subsequent coagulation.
4.1.2 Operation in thermostatic mode:
The processing vat can operate as a thermostatic chamber with manually set
up of temperature and time by the operator.
Pic.7
1
Pic.6
1
2