
c)
Close any serviceable events generated during the procedure that include one of the
reference codes listed in step 6b11 on page 13 or step 6b13 on page 14.
d)
Perform problem analysis on any remaining open serviceable events.
15)
Start necessary SPCN firmware updates.
If reference code 1000913B was found in step 6b11 on page 13, an SPCN firmware update is
needed. However, due to the current SPCN Firmware Update Policy, the update could not be
initiated automatically. Therefore, the SPCN firmware update must be initiated manually. To
complete this task, see Updating the SPCN firmware (http://publib.boulder.ibm.com/
infocenter/systems/scope/hw/topic/p7ham/ipham_updatespcn.htm).
Wait for the SPCN firmware updates to complete before continuing to the next step. This
update could take 20 minutes to several hours, depending on the number of expansion units
on the SPCN loop and the current level of the SPCN firmware in the expansion units that
were added.
16)
If you changed the SPCN Firmware Update Policy in step 6b4 on page 12, change the policy
back to the original setting now:
a)
Access the ASMI by using an authority level of administrator or authorized service
provider. For details, see Managing the Advanced System Management Interface
(http://publib.boulder.ibm.com/infocenter/systems/scope/hw/topic/p7hby/asmi.htm).
b)
In the ASMI navigation area, expand
System Configuration
and select
Configure I/O
Enclosures
.
c)
Change the
SPCN Firmware Update Policy
setting to the setting recorded in step 6b4 on
page 12. Use the default setting, which is
Enabled
.
17)
Verify the new configuration. For details, see Verifying that the new configuration is
functioning (http://publib.boulder.ibm.com/infocenter/systems/scope/hw/topic/p7ham/
verify.htm).
18)
If the system has logical partitions, you can now assign I/O slots in the expansion units that
were added to logical partitions.
You have completed the addition of your expansion unit.
7.
Verify that the SPCN is functioning as follows:
a.
Choose one the following options to verify the SPCN:
v
If your system is not managed by a Hardware Management Console (HMC) or Systems Director
Management Console (SDMC), continue with step 7b.
v
If your system is managed by an HMC, continue with step 7c.
v
If your system is managed by an SDMC, continue with step 7d on page 17.
b.
Choose one the following options:
Important:
Multiple options might apply to your configuration. Choose only the first option that
applies.
v
If your system is running the Virtual I/O Server (VIOS) operating system, continue with step 7e
on page 17.
v
If your system is running the AIX operating system, continue with step 7f on page 17.
v
If your system is running the Linux operating system, continue with step 7g on page 18.
c.
Use the HMC to verify that no serviceable events include 10009
xxx
reference codes (where
x
is any
character 0 - 9 or A - F) by completing the following steps:
1)
In the navigation area, select
Service Management
.
2)
In the contents area, select
Manage Serviceable Events
.
3)
In the Manage Serviceable Events window, perform the following steps:
a)
Click
Open
for the
Serviceable Event Status
field.
16
Power Systems: Installing the 57/96 and 14G/30 expansion units
Содержание ESCALA Power7 5796 G30
Страница 1: ...ESCALA Power7 Installing the 5796 and 7314 G30 expansion units REFERENCE 86 A1 25FF 05...
Страница 2: ......
Страница 6: ...iv Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 34: ...22 Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 42: ...30 Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 52: ...40 Power Systems Installing the 57 96 and 14G 30 expansion units...