
i.
Align the top alignment pin of the bracket
(F)
with the highest mark, and use one M5 screw
(G)
to
secure the bracket to the rack at this location.
Note:
The bracket will face inward.
j.
Locate the marks that were previously made on the back-right rail of the rack. Using two M5
screws
(G)
, secure the rail arm to the rack at the location of the two lowest marks.
k.
Align the top alignment pin of the bracket
(F)
with the highest mark, and use one M5 screw
(G)
to
secure the bracket to the rack at this location.
l.
Tighten the two screws
(B)
in the middle of the left rail and the two screws
(B)
in the middle of the
right rail. See Figure 2 on page 5.
4.
Install the shell as follows:
a.
From the front of the rack, place the shell
(A)
on the rails and slide it into the rack.
Figure 4. Attaching the rails to the back of the rack
Installing the 57/96 and 14G/30 expansion units: Details
7
Содержание ESCALA Power7 5796 G30
Страница 1: ...ESCALA Power7 Installing the 5796 and 7314 G30 expansion units REFERENCE 86 A1 25FF 05...
Страница 2: ......
Страница 6: ...iv Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 34: ...22 Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 42: ...30 Power Systems Installing the 57 96 and 14G 30 expansion units...
Страница 52: ...40 Power Systems Installing the 57 96 and 14G 30 expansion units...