
EGK 2A Ex
1.5 Ordering instructions
The item number is a code for the configuration of your unit. Please use the following model key:
Please note:
Every individual gas path must be equipped with condensate drain.
4590
X X X X X X X
1 Product characteristics (metric connections)
Voltage
1)
1
115 V
2
230 V
Gas path/material/version
0 0 0
without heat exchanger
1 gas path/material/version
1
1
0
1x single heat exchanger/stainless steel/TS
1
2
0
1x single heat exchanger/glass/TG
1
3
0
1x single heat exchanger/PVDF/TV
2 gas paths/material/version
2
1
0
2x single heat exchanger/stainless steel/TS
2
2
0
2x single heat exchanger/glass/TG
2
3
0
2x single heat exchanger/PVDF/TV
2
6 0
1x dual heat exchanger/stainless steel/DTS (10 mm)
2
6
1
1x dual heat exchanger/stainless steel/DTS-6
2
7
0
1x dual heat exchanger/glass/DTG
2
8 0
1x dual heat exchanger/PVDF/DTV
2)
3 gas paths/material/version
3
1
0
1x single heat exc 1x dual heat exchanger/stainless steel/TS+DTS (10 mm)
3
1
1
1x single heat exc 1x dual heat exchanger/stainless steel/TS+DTS-6
3
2
0
1x single heat exc 1x dual heat exchanger/glass/TG+DTG
3
3
0
1x single heat exc 1x dual heat exchanger/PVDF/TV+DTV
2)
4 gas paths/material/version
4
6 0
2x dual heat exchanger/stainless steel/DTS (10 mm)
4
6
1
2x dual heat exchanger/stainless steel/DTS-6
4
7
0
2x dual heat exchanger/glass/DTG
4
8 0
2x dual heat exchanger/PVDF/DTV
2)
Condensate drain
0 0 0
without condensate drain
1 gas path
1
1
1
1x peristaltic pump CPsingle with adapter
1
1
3
1x peristaltic pump CPsingle with screw connection
3
0 0
1x AK20 installed
3)
4
0 0
1x 11 LD V38 installed
2 gas paths
1
2
2
1x peristaltic pump CPdouble with adapter
1
2
4
1x peristaltic pump CPdouble with screw connection
3
0 0
2x AK20 installed
3)
4
0 0
2x 11 LD V38 installed
3 gas paths
1
3
2
1x peristaltic pump CP 1x peristaltic pump CPsingle with adapter
1
3
4
1x peristaltic pump CP 1x peristaltic pump CPsingle with screw connection
3
0 0
3x AK20 installed
3)
4
0 0
3x 11 LD V38 installed
4 gas paths
1
4
2
2x peristaltic pump CPdouble with adapter
1
4
4
2x peristaltic pump CPdouble with screw connection
3
0 0
4x AK20 installed
3)
4
0 0
4x 11 LD V38 installed
4
Bühler Technologies GmbH
BE450020 ◦ 01/2020
Содержание EGK 2A Ex
Страница 37: ...PE Sammelschiene ...
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......