7.1 Maintenance Schedule
Component
Interval*
Work to be performed
To be performed by
Pressure switch
every 8,000 h or 1 year
Testing the pressure monitoring cir-
Customer
Starting capacitor
every 8,000 h or 1 year
check for damages
Customer
Condenser (air heat
exchanger)
every 8,000 h or 1 year
If ribs/cover is covered with dust or deposits, clean with
compressed air per chapter
Customer
Motor CP X1
after ~30,000 h
Replace motor
Service technician/
Bühler Technologies
during operation
to changes in how the motor sounds during operation Customer
Bearing CP X1
after ~30,000 h
Change bearing
Service technician/
Bühler Technologies
when replacing the hose
visually inspect for contamination.
Customer
during operation
to changes in operating noise
Customer
Pump head CP X1
every 24,000 h or 3 years
Visually inspect for tears/cracks
Customer
every 8,000 h or 1 year
Visually inspect for contamination from abrasion
Customer
Rotor CP X1
every 16,000 h or 2 years
Visually inspect for tears/cracks
Customer
Pressure rollers CP X1 every 12,000 h or 1.5 years
Visually inspect for abrasion
Customer
Pressure spring CP X1 every 12,000 h or 1.5 years
Visually inspect for wear/loss in clamping action
Customer
Pump hose CP X1
every 4,000 h or 6 months Visually inspect for ab leaks
Customer
every 8,000 h or 1 year
Replace hose
Customer
Pump cover CP X1
every 16,000 h or 2 years
Visually inspect for cracks in the cover
Customer
Knurled nuts CP X1
when replacing the hose
retighten all knurled nuts hand tight
Customer
*When operating hours/years is specified, whichever comes first applies.
7.2 Maintenance
DANGER
Danger to life and explosion during installation and maintenance
The unit must not be worked on (assembly, installation, maintenance) in explosive at-
mospheres.
The following checks and, if necessary, cleaning must be performed at least once a year. No additional maintenance is required.
A maintenance record should be kept. A master operations diary can be found at the end of the operating instructions for copy-
ing.
DANGER
Spark formation due to electrostatic charge
Always clean plastic housing parts and decals with a damp cloth.
Connect metal housings with earth potential (PE) conductive!
7.2.1 Testing the pressure monitoring circuit
The cooler must be operating and within the operating range (indicator green).
– Press the "Test1" button. The cooler will switch off and the display will flash, indicating the current temperature and the mes-
sage “
Stop
“.
– Press the "Start1" button. The cooler will switch back on and the steady display will indicate the current temperature.
– Press the "Test2" button. The cooler will switch off and the display will flash, indicating the current temperature and the mes-
sage “
Stop
“.
– Press the "Start2" button. The cooler will switch back on and the steady display will indicate the current temperature.
20
Bühler Technologies GmbH
BE450020 ◦ 01/2020
Содержание EGK 2A Ex
Страница 37: ...PE Sammelschiene ...
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......