Burner installation
22
Installation and maintenance instructions Logano GE315 • Issue 02/2006
We reserve the right to make any changes due to technical modifications.
2.6.3
Install the burner door
Both hinges are fitted at the factory (Fig. 26,
Item 4 & 6
)
to the r.h. side of the burner door. To convert to l.h.
hinges, fit the hinge parts to the l.h. side of the burner
door.
z
Secure each hinge pin (Fig. 26,
Item 1 & 3
) with
2 No. M 12 x 50 screws on the front section. Fig. 26
shows this as r.h. closing. Fit the hinge pins to the l.h.
side for l.h. closing.
z
Stick sealing cord (18 mm dia.) into the front section
using adhesive. Position the butt ends of the gasket
string on the side of the section (Fig. 26,
).
z
Hook the burner door with the hinge rings onto the
hinge pins.
2.6.4
Insert the hot gas baffle plates
z
Remove the hot gas baffle from the fitting crate and
insert it into the hot gas ways according to the
instructions cast into the baffle body
(see Fig. 27
and the following table).
NOTE!
The hot gas baffles are already fitted if you
receive a pre-assembled boiler block. You
must only remove the protective transport
packing.
Boiler
size
in kW
Number
of boiler
sections
Number of
hot gas baffle
plates
Length of
hot gas baffle
plates
Fitting
instructions
on the baffle
105
5
4
360
upper r.h.
upper l.h.
lower r.h.
lower l.h.
140/
170
6 – 7
4
440
200
8
4
360
230
9
4
200
Fig. 26
Hooking on the burner door
Fig. 27
Hot gas baffle plates
1
2
5
3
4
6