background image

Please read thoroughly before starting installation

7217 5800 – 01/2006 GB (EN)

For heating engineers

Installation instructions

Logamax plus GB162-80/100
cascade unit

Содержание GB162-80

Страница 1: ...Please read thoroughly before starting installation 7217 5800 01 2006 GB EN For heating engineers Installation instructions Logamax plus GB162 80 100 cascade unit...

Страница 2: ...Supports Item 2 Connecting frame Item 3 Main gas pipe Item 4 Flow and return header Item 5 Gas connection kit TL inline Item 6 Mounting bracket Item 7 Boiler connection set TL inline Item 8 Boiler co...

Страница 3: ...l co uk Installation instructions Logamax plus GB162 80 100 cascade unit Version 01 2006 List of contents 1 General points 4 2 Items supplied with unit 4 3 Dimensions 6 4 Cascade frame installation 8...

Страница 4: ...vidual cascade frame parts enable simple and quick installation 2 Items supplied with unit Cascade frame fig 1 Supports Connecting frame Main gas pipe Flow and return header Boiler connection kit Flan...

Страница 5: ...ous configurations fig 4 By using the bend set the low loss header can be installed at an angle to the boilers The gas pipe is reversible so that the gas connection can be at the other side of the boi...

Страница 6: ...01 2006 Dimensions 3 3 Dimensions Fig 5 Dimensions of cascade systems 1 Item A TL inline configuration Item B TR back to back installation Item 1 Flow and return header Item 2 Low loss header with ben...

Страница 7: ...L3 1625 38 1663 575 TL4 2150 42 2192 575 TL5 2675 45 2720 575 TL6 3200 45 3245 575 TL7 3725 45 3770 575 TL8 4250 45 4295 575 Table 4 TL inline configurations Cascade system Header inch Length mm B1 mm...

Страница 8: ...main gas pipe Use the M8 x 70 screws for this Do not fully tighten the screws yet z Install the header pipe Use the M8 x 70 screws for this Do not fully tighten the screws yet z Fit the boiler mounti...

Страница 9: ...pipe s between the header and the pump group z Install the return pipe s between the header and the pump group z Repeat the above steps to install all boilers z If required seal off any unused connec...

Страница 10: ...trim the insulation so that it is straight fig 9 item 3 z For 2 and 3 low loss header install the inserts in the outer insulation For a 2 low loss header install the redu cing inserts in the outer rec...

Страница 11: ...11 We reserve the right to make technical modifications W http www buderus commercial co uk Installation instructions Logamax plus GB162 80 100 cascade unit Version 01 2006 Notes...

Страница 12: ...Commercial Fax 01905 75 31 30 www buderus commercial co uk In the UK Buderus is a trading name of BBT Thermotechnology Ltd C F Quadrant Ltd Unit L40 Cherry Orchard Industrial Estate Cherry Orchard Dub...

Отзывы: