2 8
|
GB125 Concentric Vent
Design Manual
GB125 Concentric Vent Design Manual | 05 .2009
Technical specifications are subject to change without prior notice
Installing the Inspection and Cleanout Tee for UB
Flex pipe
A local jurisdiction may require an inspection and
cleanout Tee to be installed in the vent pipe inside the
chimney. The Tee is installed in similar fashion to the
Union for UB Flex Pipes described above.
Table 16
Part Number
Description
87094676
Inspection and cleanout Tee for UB Flex
It comes with a screw cap on the side that allows access
for inspection and cleaning. It is installed at the bottom of
the chimney just above the supporting elbow, and
requires an access door in the chimney wall.