12
BÜCHI
Vac
V-511/512/513
4 Beginning Operation
Fig. 9: Installation diagram 1
햲
햸
햴
햶
햵
햷
햳
햴
햵
햹
햺
햷
햻
햽
햾
햽
햿
Connections to a Rotavapor
햲
Control cable V-800 to pump
햳
Cooling water valve on the "CW" connection
햴
Cooling water inlet (CW in)
햵
Cooling water outlet to Rotavapor (CW out)
햶
Cooling water outlet from Rotavapor
햷
Vacuum hose to Rotavapor (red hose)
햸
Power cable socket
햹
Hose connection to V-800
햺
Hose connection to pump
햻
Connection to pump outlet
햽
Exhaust hose
∅
14mm
햾
Woulff-bottle
햿
Connection to further user (cf. Page 15)
The inert gas ventilation of the Rotavapor is handled by the
Vacuum Controller (cf. Page 20).
During operation, the valve unit is in a vacuum. Please inspect
glass parts for splinters or cracks.