5 Putting into operation
20
V-850 / V-855 Operation Manual, Version E
5
Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE:
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.
Keep the original packaging for future transport.
5 .1
Setting up the Rotavapor with the Vacuum Controller V-850 / V-855
5 .1 .1
Installation
3
2
1
To install the vacuum controller to the Rotavapor,
proceed as follows:
• Screw the holder
a
for the vacuum controller
to the top of the Rotavapor.
• Slide the guide rail
b
of the vacuum controller
over the holder.
• Fix the vacuum controller to the holder by
tightening the knurled nut
c
.