
79
BTU VENTILATION CORPORATION
●
OFFICE 888-884-8070
●
FAX 218-346-7485
●
www.btucorp.com
XT-70 Control Panel
79
With the cable plugged in and Hyper Terminal connected, power up the XT panel.
The initial string of data will be displayed.
Inside XT Panel Firmware - XT 1.3.1.a
I/O lines configured
OS Initialized
Queue Manager Initialized
Flash Initialized
socket Initialized
http Initialized
Starting OS
Attempting to read Misc Data
Misc Data read from page 1
flash_crc == EF41 calc_crc == EF41
ip address = 192.168.1.55
udp port = 4005
http port = 4005
panel # = 5
Alarm_Settings.crc == D3EE calc_crc == D3EE
flash_crc == D8DA calc_crc == D8DA
HTTP server Initialized
Authorizations Initialized
Record Task is not OK
Some of the valuable parameters displayed are the IP address, the port and the panel number informa-
tion.
Содержание XT-70
Страница 1: ...Manual XT 003 5 Copyright BTU Ventilation 2013 ...
Страница 2: ......
Страница 107: ...107 ...