This document is a
Property of BTCPower Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
10-Dec-20
Revision
D
150kW High Power DC Charger
INSTALLATION AND USER’S
MANUAL
Page
61
of
63
APPENDIX
•
Start pump for around 60 seconds
o
Place an object to continuously engage the relay contactor and start the pump.
o
Coolant flows into the cable and heat exchanger (copper pipes)
•
Stop system running
•
Fill in remaining coolant amount using a funnel or tube. Extra careful, pump could still be
warm)
•
Close tank with filling plug
•
Cooling unit is ready