9/25
6 washers
3. WIRING AND INSTALLATION PROCEDURES
Your
BSG
is shipped partially disassembled. Refer to page 18 for assembly instructions.
Please completely read all procedures before beginning installation.
NOTE:
Do not install the blade/hub assembly until the turbine is mounted on the tower
Required Tools:
•
6.0mm hex key wrench
•
8.0mm hex key wrench
•
14.0 hex key wrench
•
Torque wrench with 250*30mm hex drives
•
Soldering iron or propane torch
•
Rosin core solder
•
Wire
strippers
•
Wire
crimpers
3.1 Wiring
3.1.1 Electrical Connections
NOTE: Refer To All Local and National Codes before Installation.
CAUTION:
MAKE SURE THE TURBINE IS DISCONNECTED FROM THE
BATTERIES DURING INSTALLATION.
CAUTION:
CONNECTIONS SHOULD BE INSPECTED PERIODICALLY FOR
SIGNS OF CORROSION AND CLEANED WHEN NECESSARY.
NOTE:
All electrical power cables should be physically protected. Run the wires inside
the tower or conduit for maximum protection.