34
Table 4 – Smart start assist Led indicators
Red LED
Relay Contact*
Condition
Action
Fully ON
1
11/12
Min. recovery time between starts and/or recov-
ery time between stop to start
Auto reset when minimum recovery tie
elapses.
2 flashes
11/14
Under---voltage (Ue < 190VAC)****
Auto reset with 5 min. recovery**
3 flashes
11/14
Over current (>80A for
≥
1 sec.)
Auto reset with 5 min. recovery
4 flashes
11/14
Relay protection
Auto reset with 5 min. recovery***
5 flashes
11/14
Incomplete ramp
Auto reset with 5 min. recovery
N/A
11/12
Supply phase loss
Physical check
N/A
11/12
Idle state
N/A
11/12
Ramping state
N/A
11/12
Bypass mode
Green LED
Relay Contact*
Condition
Action
Flashing
11/12
Power supply alarm
Replace Smart Start device
Fully ON
11/12
Idle state
RSBS waiting for control signal to start
Notes:
1
Applicable to RSBS2332A2V.2C24HP For other models, no indication on the Red LED is provided
*
Applies only to RSBS23XXA2V22C24 models
**
Monitored during idle and bypass
***
Refer to note 6 in Mode of Operation section in Smart Assist Installation Instruction.
****
Refer to voltage dips and interruptions section in Smart Assist Installation Instruction for mode of operation.
CONFIGURATIONS
Horizontal Configuration
The Horizontal Configuration water source heat pump is designed
to have a field configurable blower orientation: end blow (default)
and straight through. (See Fig. 25 and Fig. 26)
A14034
Fig. 25 -- End Blow Configuration (default)
A14035
Fig. 26 -- Straight Through Configuration
NOTE
: Left--hand and Right--hand horizontal (HZ) units have
different Blower Configuration instructions. Be sure ro refer to the
correct instructions in this document for the proper installation for
each configuration.
NOTE
: Internally mounted electric heat is available in end blow
configurations only.
NOTE
: Blower configuration changes should be done prior to
unit being installed in the final location.
CAUTION
!
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment
damage or improper operation.
Discharge air configuration change is not possible on Heat
Pumps equipped with Electric Heat Option.
REQUIRED TOOLS:
S
5/16” hex head screwdriver
S
Phillips head screwdriver
S
3/8” hex head screwdriver
S
1/4” hex head screwdriver
S
7/16” hex head screwdriver
S
Needle nose pliers
S
Flat screwdriver
S
5/16” -- 1/4” ratchet wrench
Left--Hand Unit (GT024--72H*L) Instructions:
1. Remove and retain end and side panels. See Fig. 27.
2. Disconnect blower motor wiring and ground wire fastened
to blower housing. See Fig. 28.
3. Remove and retain bracket by removing (3) screws. See
Fig. 29.
4. Loosen blower assembly by removing (4) screws. See Fig.
30.
5. Remove and retain bracket by removing (2) screws. See
Fig. 31.
6. Rotate the blower into its new position. See Fig. 32.