47
RTU OPEN CONTROLLER SYSTEM —
The RTU Open
controller is an integrated component of the Bryant rooftop unit.
Its internal application programming provides optimum perfor-
mance and energy efficiency. The RTU Open controller enables
the unit to run in 100% stand-alone control mode or a Third Party
Building Automation System (BAS). On-board DIP switches al-
low you to select your protocol (and baud rate) of choice among
the four most popular protocols in use today: BACnet
1
, Modbus
2
,
Johnson N2 and LonWorks
3
The RTU Open controller is factory-mounted in the 580J unit’s
main control box, to the left of the CTB. See Fig. 67-71. Factory
wiring is completed through harnesses connected to the CTB.
Field connections for RTU Open sensors will be made at the PCB
connectors on the RTU Open board. The factory-installed RTU
Open controller includes the supply-air temperature (SAT) sensor.
The outdoor air temperature (OAT) sensor is included in the FIOP/
accessory EconoMi$er2 package.
Refer to Table 24, RTU Open Controller Inputs and Outputs for
locations of all connections to the RTU Open board. See Fig. 67-
71 for wiring diagrams.
Fig. 66 — RTU Open Multi-Protocol Control Board
1. BACnet is a registered trademark of ASHRAE (American Society
of Heating, Refrigerating and Air-Conditioning Engineers).
2. Modbus is a registered trademark of Schneider Electric.
3. LonWorks is a registered trademark of Echelon Corporation.
J4
J2
J1
J5
J5
J22
J17
J19
J14
J11
J22
J
3
J1
3
J12
J15
J20
Network Comm
Confi
g
urab
le - Input_
8
24 V
A
C
Confi
g
urab
le - Input_5
24 V
A
C
Confi
g
urab
le - Input_
3
24 V
A
C
Input_9 (Humidi
s
tat)
24 V
A
C
24 V
A
C
Input _
8
(Enthalp
y)
A
O-1 (ECON)
Gnd
(O
A
T
)
Gnd
(
S
AT
)
Input_5 (
S
MK)
Input_4
(R)
BO-5
(Y1)
BO-4
(Y2)
BO-
3
(W1)
BO-2
(W2)
BO-1
(G)
Gnd
Input_
3
(X)
24
V
A
C
IN
+24 VDC
Input_2 (CO2/RH)
Gnd
+24 VDC
Input_1 (CO2/RH)
Gnd
Board Power
(AO-1)
0-10VDC
4-20mA
BO-6
(H) Dehumidification
BO-7
(Rever
s
in
g
Valve/Hi
g
h
S
peed Fan/Y
3
)
BO-
8
(Power Exhau
s
t)
LonWork
s
Option Card
Port
Example
s
et for
BACnet M
S
/TP
and 76.
8
K baud
(1, 2, and 4 ON)
Protocol
S
elector
S
PT (temp input)
BACnet, Modbu
s
, or N2
(LON connection J15)
S
PT (common)
S
PT (off
s
et input)
*
Remove
both for 0-5V
AO-2
GND
(2-10V)
3
-Volt
Lithium
Battery
BO-1
BO-2
BO-
3
BO-4
BO-5
BO-6
BO-7
BO-
8
VFD Output
Содержание 580J*16D Series
Страница 4: ...4 Fig 2 Unit Dimensional Drawing Sizes 08 09 and 12 ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing Sizes 08 09 and 12 cont ...
Страница 6: ...6 Fig 3 Unit Dimensional Drawing Size 14 ...
Страница 7: ...7 Fig 3 Unit Dimensional Drawing Size 14 cont ...
Страница 8: ...8 Fig 4 Unit Dimensional Drawing Size 16 ...
Страница 9: ...9 Fig 4 Unit Dimensional Drawing Size 16 cont ...
Страница 15: ...15 Fig 9 580J 16 Roof Curb Details ...
Страница 32: ...32 Fig 58 580J 08 14 Typical Perfect Humidity Dehumidification System Humidistat Wiring ...
Страница 33: ...33 Fig 59 580J 16 Typical Perfect Humidity Dehumidification System Humidistat Wiring ...
Страница 48: ...48 Fig 67 580J 08 12N P Typical RTU Open System Control Wiring Diagram ...
Страница 49: ...49 Fig 68 580J 08 14 Typical RTU Open System Control Wiring Diagram ...
Страница 50: ...50 Fig 69 580J 16 Typical RTU Open System Control Wiring Diagram ...
Страница 51: ...51 Fig 70 580J 8 14 Typical RTU Open System Control Wiring Diagram with Perfect Humidity System ...
Страница 52: ...52 Fig 71 580J 16 Typical RTU Open System Control Wiring Diagram with Perfect Humidity System ...