background image

18

IN
L

E

T

EXHAUST

IN

ON

OFF

VE

NT

AIR

FL

O

W

Street Elbow

1

/

2

CPVC

(Loose parts bag)

Casing Grommet
Black Rubber

5

/

8

ID

(Loose parts bag)

Drain Tee

Drain Connector Black PVC

3

/

4

PVC X

1

/

2

CPVC

(Loose parts bag)

Drain Line Vent Tee

3

/

4

PVC or

1

/

2

CPVC (Field supplied)

Drain Tube
Black Rubber

1

/

2

ID & Clamps

Drain Tube
Corrugated

5

/

8

ID

& Clamps

Relief Tube
Black Rubber

3

/

16

ID

Coupling & Clamps
(Optional)

25--24--80

Single Pressure
Switch

Dual Pressure Switch Detail

Drain Tube Black Rubber

5

/

8

ID & Clamps,

Cut length to fit (Loose parts bag)

On Some Models
ONLY

Plastic Caps (2)
Yellow or black

Vent Drain
& Clamps

Representative drawing only, some models may vary in appearance.

A07706

Fig. 10 -- Upflow Installations Top Vent

Upflow Installations Top Vent (See Fig.

10)

S

Remove knockout from the side of the furnace casing where
drain tube will exit.

S

Install casing grommet (black rubber

5

/

8

(16 mm) ID

grommet -- in loose parts bag)

S

Install the

1

/

2

(13 mm) CPVC street elbow on discharge of trap

S

Install the black PVC tube connector (

3

/

4

(18 mm) PVC x

1

/

2

(13 mm) CPVC from loose parts bag) as shown in the
illustration above.

S

Cut the black drain tube (

5

/

8

(16 mm) ID -- in loose parts bag)

to length to fit between trap and tube connector through
grommet.

S

Clamp both ends of the drain tube using clamps provided.

S

Glue the CPVC street elbow to the trap using appropriate
cleaner and solvent cement.

S

The field supplied

3

/

4

PVC or

1

/

2

(13 mm) CPVC drain line

vent tee must vent outside the furnace cabinet (see exploded
view above).

NOTE

: It is recommended that all PVC piping and fitting

connections be fit up and inspected before final cementing.

Trap

must be primed before operation.

Verify all condensate drain

connections are securely clamped. A coupling and clamps (in
loose part bag) may be installed as shown for future servicing of
the vent system.

NOTE

:

“PVC” is used as a generic term. Pipe and fitting

materials used must be acceptable to the local code officials
having jurisdiction.

359AA

V

Содержание 4-WAY MULTIPOISE 359AAV

Страница 1: ...sulted before installation to determine the need to obtain a permit IPEX System 636 is a trademark of IPEX Inc CONSIGNES SP CIALES POUR L IN STALLATION DE VENTILLATION AU CANADA L installation faite a...

Страница 2: ...or of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall...

Страница 3: ...h unit and other safety precautions that may apply These instructions cover the minimum requirements and conform to existing national standards and safety codes In some instances these instructions ex...

Страница 4: ...ldings or structures under construction S This furnace is NOT approved for installation in mobile homes trailers or recreation vehicles S Seal around supply and return air ducts S Install correct filt...

Страница 5: ...to the plastic Transition box Squeeze the hose together near the end and quickly reconnect the 3 4 19 mm OD rubber hose to the stub on the condensate trap Secure with the hose clamp When you return ho...

Страница 6: ...the floor S Located or physically protected from possible damage by a vehicle 10 Local codes may require a drain pan under the entire furnace and condensate trap when the furnace is installed in atti...

Страница 7: ...For venting information literature contact www Bryant com with the complete model and serial number of the furnace On the Dual Certified furnace the vent and combustion air pipes attach to the furnace...

Страница 8: ...2 122 2 27 318 177 5 609 6 30 2 249 2 177 8 31 7 73 549 3 27 109 5 122 2 758 8 690 6 549 3 855 7 439 7 42 9 123 8 177 8 47 6 469 9 723 9 57 2 336 6 60 3 27 1016 19 1 587 4 98 4 Specifications are subj...

Страница 9: ...t or masonry chimney Multistory venting is NOT permitted If this furnace is replacing a previously common vented furnace it may be necessary to resize the existing vent and chimney to prevent oversizi...

Страница 10: ...322 cm2 33 3 sq in 215 cm2 25 sq in 161 cm2 6 152 mm EXAMPLE Determining Free Area Furnace 100 000 Furnace 100 000 Water Heater 30 000 Water Heater 30 000 Total Input 130 000 4 000 Total Input 130 000...

Страница 11: ...idered as communicating spaces where such spaces are connected by one or more openings in doors or floors having a total minimum free area of 2 in 2 1 000 BTUH 4 400 mm2 kW of total input rating of al...

Страница 12: ...ce can NOT be common vented or connected to any type B BW or L vent or vent connector nor to any portion of a factory built or masonry chimney If this furnace is replacing a previously common vented f...

Страница 13: ...12 The minimum pipe run length is 2 6 M 13 The piping can be run in the same chase or adjacent to supply or vent pipe for water supply or waste plumbing It can also be run in the same chase with a ven...

Страница 14: ...are required the length can be INCREASED by 5 1 5 M for each additional elbow NOT used NOTE It is allowable to use larger diameter pipe and fitting than shown in the tables but not smaller diameters t...

Страница 15: ...15 12 inches 30 cm for applieances 10 000 Btuh 3 kW and 100 000 Btuh 30kW 36 inches 91cm for appliances 100 000 Btuh 30kW A06675 Fig 7 Direct Vent Termination Clearance 359AAV...

Страница 16: ...16 Fig 8 Other than Direct Vent Termination Clearance 359AAV...

Страница 17: ...remain in the furnace between the door switch plate and the blower shelf Fig 9 during operation See Fig 19 for proper routing and installation of the overflow DO NOT trap the drain line in any other l...

Страница 18: ...rommet in loose parts bag S Install the 1 2 13 mm CPVC street elbow on discharge of trap S Install the black PVC tube connector 3 4 18 mm PVC x 1 2 13 mm CPVC from loose parts bag as shown in the illu...

Страница 19: ...of 2 51 mm PVC pipe long enough to exit the cabinet and connect the vent drain to either A standard field supplied 2 51 mm PVC tee or A 2 PVC coupling fastened onto the drain tee S Install tee trap in...

Страница 20: ...the vent drain to the trap Secure all connections with clamps S Install the vent pipe grommet into the casing S Cut an appropriate length of 2 51 mm PVC pipe long enough to exit the cabinet and conne...

Страница 21: ...to the left side of the unit using the two 2 screws provided Cut the 5 8 16 mm ID corrugated hose as shown above and fasten the 90 bend end to the trap and fasten the straight end to the transition dr...

Страница 22: ...o the top of the trap and mount the trap externally to the right side of the unit using the two 2 screws provided Connect the corrugated drain tube from the transition box to the trap as shown If an e...

Страница 23: ...he 2 screws provided in the location shown S Cut the corrugated tube as shown in the illustration above Connect the corrugated hose from the transition to the trap Secure connections with clamps S Rem...

Страница 24: ...e will exit S Mount the trap externally to the bottom side of the unit using the 2 screws provided in the location shown S Cut the corrugated tube as shown in the illustration above Connect the corrug...

Страница 25: ...Mount the trap externally to the bottom side of the unit using the 2 screws provided in the location shown S Cut the corrugated tube as shown in the illustration above Connect the corrugated hose from...

Страница 26: ...will exit S Mount the trap externally to the bottom side of the unit using the 2 screws provided in the location shown S Cut the corrugated tube as shown in the illustration above Connect the corrugat...

Страница 27: ...ig 18 that corresponds to the installation position of the furnace for the application Preassemble the vent and combustion air piping from the furnace to the vent termination Do not cement the pipe jo...

Страница 28: ...til it bottoms out NOTE Cement MUST be fluid while inserting pipe If NOT recoat pipe 4 Hold the pipe in the fitting for 30 seconds to prevent the tapered socket from pushing the pipe out of the fittin...

Страница 29: ...ng materials may be affected by flue products expelled in close proximity to unprotected surfaces Sealing or shielding of the exposed surfaces with a corrosion resistant material such as aluminum shee...

Страница 30: ...Snow Level 36 Min 2 50 8mm Max 36 Min OR 914 4mm 914 4mm A07718 Fig 25 Concentric Vent and Combustion Air Roof Termination A Vent Dimension A is touching or 2 in 503 8mm maximum separation 25 22 02d...

Страница 31: ...he installation from Table 4 and Fig 32 2 Determine the best location for the termination kit See Fig 31 for vertical termination or Fig 35 for horizontal termination Roof termination is preferred sin...

Страница 32: ...Airflow restriction will occur and the furnace pressure switch may cause intermittent operation Drill clearance hole in rain cap and pilot hole in vent pipe Stainless steel screw Field supplied A07722...

Страница 33: ...essures Combustion Air Vent Combustion Air Vent 45 Elbow Field Supplied 25 22 02 Strap Field Supplied Flush to 1 25 4mm max Note Securing strap must be field installed to prevent movement of termina t...

Страница 34: ...in National Fuel Gas Code or CGA codes 3 Two stage regulation of Propane gas is recommended Propane Conversion FIRE EXPLOSION HAZARD Failure to follow this warning could result in personal injury or d...

Страница 35: ...2 pressure switches Manual shut off valve Alternative installation Representative drawing only some models may vary in appearance A07724 Fig 36 Typical Gas Piping for Upflow Use elbows and 3 76 mm pip...

Страница 36: ...s 6 and 7 Table 7 LPG or Propane Gas Manifold Pressure in wc HEATING VALUE BTU CU FT FURNACE INPUT BTU BURNER MEAN ELEVATION FEET ABOVE SEA LEVEL Ft M 0 to 2000 2001 to 3000 3001 to 4000 4001 to 5000...

Страница 37: ...injury and or loss of life WARNING 1 The furnace and the equipment shut off valve must be dis connected from the gas supply piping system during any pressure testing of that system at test pressures...

Страница 38: ...e 115V HUM called HUM on Control is energized when the inducer is energized ELECTRONIC AIR CLEANER EAC is energized when there is a blower speed call except is NOT energized when blower operates in th...

Страница 39: ...ucts under the floor or through the attic 1 For side connections using a 16 x 25 406 x 635 mm filter cut out the embossed area shown in Fig 41 This will provide a 141 2 x 221 2 368 x 572 mm approxim a...

Страница 40: ...unit to avoid condensation on the heat exchanger All furnaces are designed with a break away duct flange on the supply air side of the furnace This allows for installation in the horizontal right or...

Страница 41: ...tent 1 Turn OFF gas supply to all appliances and start furnace Use jumper wire on R to W for Heat 2 Time how many seconds it takes the smallest dial on the gas meter to make one complete revolution Re...

Страница 42: ...inal will not be available at the Unused Motor Lead location Continuous Fan Operation using G Energizing the G terminal on the furnace control provides continuous fan operation This is done by connect...

Страница 43: ...lve is energized the main burners light and flame is sensed S The igniter is de energized after the main burners ignite S FCB will delay blower operation for the 30 seconds timed from the opening of t...

Страница 44: ...ger than two minutes 1 hr delay roll out switch requires manual reset 8 Flashes Permanent Lockout Gas valve relay contact stuck closed or miswired gas valve power reset only 10 Flashes Line voltage 11...

Отзывы: