The FT Series Heating Only, Boiler
Page 77
4. Pour the cleaning solution into the bucket.
Place the drain hose (D1) and the hose (D2) to the
pump inlet into the cleaning solution.
5. Open service valves (V3 & V4) on the hot water
outlet and cold water inlet lines.
6. Turn on the circulation pump (Operate the pump and
allow the cleaning solution to circulate through the
boiler for at least 1 hour at a rate of 4 gallons per
minute.)
7. Rinse the cleaning solution from the boiler as follows:
- Remove the free end of the drain hose (D1) from
the bucket.
- Close service valve, (V4), and open shut off valve,
(V2).
Do not open shut off valve, (V1).
- Allow water to flow through the boiler for 5 minutes.
- Close shut off valve (V2).
FT Series Boilers are certified for indoor use only, and
are not design-certified for placement outdoors.
Proper precautions for freeze protection are
recommended for boiler installations in areas where
the danger of freezing exists.
Power outage, interruption of gas supply, failure of
system components, activation of safety devices, etc.,
may prevent a boiler from firing.
Any time a boiler
is subjected to freezing conditions, and the boiler
is not able to fire, and/or the water is not able to
circulate, there is a risk of freezing in the boiler
or in the pipes in the system.
When water freezes,
it expands which may result in bursting of pipes, or
damage to the boiler, which could result in leaking or
flooding conditions.
NOTICE
Not all pumps are capable of maintaining the reduced
temperature rise required with glycol concentrations
greater than 35%.
NOTICE
Do not exceed a 40% glycol concentration by volume
as it may result in short cycling of the burner.
NOTICE
Different glycol products may provide varying degrees
of protection. Glycol products must be maintained
properly in a heating system, or they may become
ineffective. Consult the glycol specifications, or the
glycol manufacturer, for information about specific
products, maintenance of solutions, and set up
according to your particular conditions.
8. Ensure service valves (V3 & V4) are closed and shut off valves (V1 & V2) are open.
9. Disconnect all hoses.
10. Remove the cold water inlet filter from the boiler and clean out any residues.
11. Reinsert the filter and ensure the filter cap is securely tightened.
12. Connect electrical power to the boiler.
8.3 Freeze Protection
FT Series Boilers are certified for indoor use only, and
are not design-certified for placement outdoors.
Proper precautions for freeze protection are
recommended for boiler installations in areas where
the danger of freezing exists.
Power outage, interruption of gas supply, failure of
system components, activation of safety devices, etc.,
may prevent a boiler from firing.
Any time a boiler
is subjected to freezing conditions, and the boiler
is not able to fire, and/or the water is not able to
circulate, there is a risk of freezing in the boiler
or in the pipes in the system.
When water freezes,
it expands which may result in bursting of pipes, or
damage to the boiler, which could result in leaking or
flooding conditions.
NOTICE
Not all pumps are capable of maintaining the reduced
temperature rise required with glycol concentrations
greater than 35%.
NOTICE
Different glycol products may provide varying degrees
of protection. Glycol products must be maintained
properly in a heating system, or they may become
ineffective. Consult the glycol specifications, or the
glycol manufacturer, for information about specific
products, maintenance of solutions, and set up
according to your particular conditions.
D3
D2
D1
Содержание FT Series
Страница 52: ...Page 52 4 20 Ladder Diagram ...
Страница 70: ...Page 70 6 2 Fault Tree Analysis 6 2 1 1 Flame detection ...
Страница 80: ...Page 80 SECTION 10 Parts 10 1 100 MBH Casing Assembly ...
Страница 82: ...Page 82 Heat Exchanger Assembly 100 MBH ...
Страница 84: ...Page 84 Blower Assembly 100 MBH ...
Страница 86: ...Page 86 Casing Assembly 10 2 140 MBH ...
Страница 88: ...Page 88 Heat Exchanger Assembly 140 MBH ...
Страница 90: ...Page 90 Blower Assembly 140 MBH ...
Страница 92: ...Page 92 Casing Assembly 10 3 199 MBH ...
Страница 94: ...Page 94 Heat Exchanger Assembly 199 MBH ...
Страница 96: ...Page 96 Blower Assembly 199 MBH ...
Страница 98: ...Page 98 Notes ...
Страница 99: ...The FT Series Heating Only Boiler Page 99 Notes ...