B-150 (XL)
Mounting instructions
4
. ADJUSTING THE CONSTRUCTION
› Check the top side of the construction with a laser or a level.
› If necessary, adjust the construction.
› Move the vertical poles upward untill the top side of the contruction is completely level.
› If necessary use some provisional filling.
› Check the perpendicularity trough the following dimension (L1 ± 2mm !).
› Also check the diagonals of the top side.
› If necessary, the pole supports allow a small adjustment.
› Once everyting has been adjusted,
tighten all the bolts.
› Remove the provisional filling.
4.a
LEVELNESS
L1
L1
L2
L2
L3
L3
Side view
Top view
4.b
PERPENDICULARITY
Pole support
Floorplate 20x20
Ground Anchor
(L1±1/8” !).