PAGE 6
BRUNSWICK INSTALLATION MANUAL
RAIL ASSEMBLY
FIGURE ONE
Step #1:
Position rails upside down on a protected
surface in the respective locations.
FIGURE ONE
FIGURE TWO
Step #2:
Insert stud of pocket iron into the end of the
rail. Press in tightly against the end on the rail while
threading a hex head bolt 5/16-18 x 3/4” with washer
into the threaded hole in the stud. Tighten securely.
Step #3:
Repeat above procedure with the
remaining ve pockets.
FIGURE TWO
FIGURE THREE
Step #4:
Thread a machine stud into the three locations
of each rail.
FIGURE THREE
SANTINI/SUTTON