PAGE 6

 

BRUNSWICK INSTALLATION MANUAL

 

  
  

  
  
 

RAIL ASSEMBLY

FIGURE ONE

Step #1:

  Position rails upside down on a protected 

surface in the respective locations.  

FIGURE ONE

FIGURE TWO

Step #2:

  Insert stud of pocket iron into the end of the 

rail.  Press in tightly against the end on the rail while 
threading a hex head bolt 5/16-18 x 3/4” with washer  
into the threaded hole in the stud.  Tighten securely.

Step #3: 

  Repeat above procedure with the 

remaining ve pockets.

FIGURE TWO

FIGURE THREE

 

Step #4:

 Thread a machine stud into the three locations  

of each rail.

FIGURE THREE

SANTINI/SUTTON

Содержание Santini

Страница 1: ...POCKET BILLIARD TABLE INSTALLATION MANUAL 51 906026 001 October 2017 SERVICE DEPARTMENT P O BOX 68 BRISTOL WI 53104 EMAIL BRUNSWICKSERVICE BRUNSWICKBILLIARDS COM Santini Sutton...

Страница 2: ...TON NOTE Please use the instructions in this manual to assemble the tables shown below Illustrations may be different depending on the table be ing assembled Also note that careful handling of all com...

Страница 3: ...with 3 8 16 threaded nut within the leg as shown Step 4 Continue attaching both end sill and two side sills FIGURE THREE FIGURE THREE Step 5 Set the cross supports into position Make sure that they do...

Страница 4: ...h the baseframe level and carefully posi tioned in its permanent location place the center section of slate on the table Be sure that the center section is precisely square with the frame and an equal...

Страница 5: ...st the shim position then retighten the slate attaching screws Step 10 When satis ed that both end slates are level shim the center slate section as required to obtain a ush t at both joints then scre...

Страница 6: ...t stud of pocket iron into the end of the rail Press in tightly against the end on the rail while threading a hex head bolt 5 16 18 x 3 4 with washer into the threaded hole in the stud Tighten securel...

Страница 7: ...RE TWO FIGURE THREE Step 3 Using a partner carefully turn the rail and pocket assembly over and lower over the table Step 4 Align the eighteen machine studs with the eithteen clearance through the sla...

Отзывы: