8
Installation manual (1.4)
© 2019 Brunner GmbH
Iron Dog 06
7
REQUIREMENTS TO THE INSTALLATION AREA
Possible locations for an
IRON DOG
are only such rooms, where no danger can occur, if only the
instructions for use are being followed and the system is properly used. The state, structure and intended
use of the room must be considered when choosing the location.
The installation of the
IRON DOGD
, the chimney connection and the combustion air supply must be
arranged in consultation with the stove-fitter.
The
IRON DOG
should not be installed in places where the necessary supply of combustion air is not
guaranteed or in places where flammable materials or explosives are stored, manufactured or processed.
The floor area where the device is installed must be large enough and configured in such a way that it allows
a proper operation of the stove.
Содержание IRON DOG 1
Страница 1: ...Installation manual IRON DOG 01 06 2019 ...
Страница 5: ... 2019 Brunner GmbH Installation manual 1 4 5 6 DIMENSION DRAWINGS Iron Dog 01 Iron Dog 02 ...
Страница 6: ...6 Installation manual 1 4 2019 Brunner GmbH Iron Dog 03 ...
Страница 7: ... 2019 Brunner GmbH Installation manual 1 4 7 Iron Dog 04 Iron Dog 05 ...