Installation and Operation of the DCS 350 and DHS 1100 Chambers
DOC-M88-EXX268_V1_12.2016
79
Figure 8.6: DA VINCI with DHS 1100 selected
5. The fields for temperature control should now appear in the bottom left of the
COMMANDER plug-in (next figure).
Figure 8.7: Temperature control field in COMMANDER
8.5.2
Operating the Chamber
To start using the chamber, follow these steps:
1. Open the water supply or compressed air for cooling.
2. Switch on the controller and wait until the booting process is finished. Check for
messages and follow the instructions. If problems are encountered, check the
Anton
Paar Manual
for your controller.
´
If the chamber is configured, the ICS connects automatically to the controllers after
some minutes. Everything is now ready for operation.
3. Activate the COMMANDER plugin in DIFFRAC.MEASUREMENT CENTER.
Содержание Anton Paar
Страница 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Страница 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Страница 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Страница 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Страница 58: ...Installation and Operation of the HTK Series TTK 600 XRK 900 and HPC 900 Chambers 58 DOC M88 EXX268_V1_12 2016 ...
Страница 111: ...Appendix Service Details DOC M88 EXX268_V1_12 2016 111 Figure 10 15 CHC_Stage Sample Temperature Details ...
Страница 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Страница 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...