Installation and Operation of the HTK-Series, TTK 600, XRK 900, and HPC 900 Chambers
50
DOC-M88-EXX268_V1_12.2016
6.2
Mounting the Chamber to the Goniometer
All Anton Paar chambers discussed in this chapter have the same interface for mounting
them into the goniometer center. How to mount these chambers is described in the follow-
ing paragraph.
Figure 6.1: HTK 1200N mounted on a goniometer
u
It is assumed that the diffractometer is aligned before mounting the chamber.
1. Set detector and source to a large 2θ to prevent them from restricting installation.
2. Switch off mains supply.
3. Feed all necessary cables and cooling water supply through the labyrinth for
connecting them to the temperature chamber from the front of the goniometer.
4. Remove the present sample holder and insert the chamber mount into the central hole
of the diffractometer.
Содержание Anton Paar
Страница 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Страница 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Страница 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Страница 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Страница 58: ...Installation and Operation of the HTK Series TTK 600 XRK 900 and HPC 900 Chambers 58 DOC M88 EXX268_V1_12 2016 ...
Страница 111: ...Appendix Service Details DOC M88 EXX268_V1_12 2016 111 Figure 10 15 CHC_Stage Sample Temperature Details ...
Страница 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Страница 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...