INSTRUCTIONS
2010 and up GTX and RXT platforms
6. Reinstall grab handle using new nut housings
[P14], nuts [P6], and the kept M6 bolts and
washers on both sides and rear.
7. Tighten
to
8 N•m ± 1 N•m
(71 lbf•
in
± 9 lbf•
in
).
ssi2010-005-003_b
1. Grab handle
2. Handle bolt installation
8. Reinstall bridge with coolant reservoir using the
4 bridge bolts and new M6 nut housings [P14].
ssi2010-005-001_b
1. Grab handle
2. Grab handle (rear) bolt
3. Bridge retaining bolt
9. Tighten
nuts
[P6]
to
8 N•m ± 1 N•m
(71 lbf•
in
± 9 lbf•
in
).
2011 and up - GTI and GTS platforms
10. Reinstall grab handle and coolant bottle sup-
port using new nut housings [P14], nuts [P6]
and the kept M6 bolts and washers on both
sides.
11. Tighten
to
8 N•m ± 1 N•m
(71 lbf•
in
± 9 lbf•
in
).
All models
12. If you moved bailer hoses, secure them back
in place with a new locking tie.
NOTICE
Remember to align locking tie onto
90° fitting
and not on hoses
.
1
F18P05A
HOSES SECURED WITH LOCKING TIES
1. Locking tie around bailer hoses
13. Insert the pylon cylinder into the support.
ssi2009-001-013_a
1. Pylon handle [P1]
2. Pylon cylinder notch for safety lock
14. Make sure cylinder slides up and down freely
without obstruction from grab handle then re-
sume the procedure.
WARNING
Make sure the safety mechanism stops the
cylinder in its up position.
Instruction Sheet P/N 487 800 755
9 / 11