III - 68
[ 8 ] Installing the Ground Spring and Insert Guide
(1) Insert the ground spring into the boss of the upper cover, and hang the section
"A" on the hole so that the section "B" contact the end face of the roll roller shaft.
NOTE:
Set the ground spring into the boss of the upper cover surely.
(2) Assemble the insert guide onto the upper cover and secure it with the one screw.
Figure 3.5-46 Installing the Ground Spring and Insert Guide
Taptite, bind B M2.6 x 8
Ground spring
Insert guide
"A"
Hole
Boss
Rib
Roll roller shaft
Ground spring
"B"
Upper cover
Содержание TD-4000
Страница 1: ...SERVICE MANUAL MODEL TD 4000 TD 4100N ...
Страница 139: ...Dec 2009 SM PT031 1 ...