Broseley Hereford 5 Скачать руководство пользователя страница 23

 

Mar 14/GB Issue 3 

 

 

23

 

 

 Commissioning Form

 

 

Commissioning Statement and Check-list

 

 

Stove Purchased 
From:_________________________________________________________________

 

 

Address:_______________________________________________________________

 

 

Telephone Inc area code:_________________________________________________

 

 
 

Installation Date:_____/_____/__________ Stove Name:________________________

 

 

1

st

 year service is due 1 year from this date 

 

Product Serial Number:________________ Invoice Number:_____________________

 

 
 

Stove installed by:_______________________________________________________

 

 

Address:_______________________________________________________________

 

 

Telephone Inc area code:_________________________________________________

 

 

HETAS Registration Number:______________________________________________

 

 
 

Check-list (please indicate Yes or No by circling or ticking appropriatley)

 

 

Is the flue system the correct length and diameter for stove:    

Yes    

No

 

 

Flue swept and checked for soundness:   

 

 

 

Yes    

No

 

 

Manufacturers 

clearances 

adhered: 

 

    Yes 

 

 No

 

 

Smoke spillage test performed on 

stove: 

    Yes 

 

 No

 

 

Stove controls fully explained to end user:  

 

 

 

Yes    

No

 

 

Correct fuels explained to end customer:  

 

 

 

Yes    

No

 

 

CO 

Alarm 

fitted 

and 

tested: 

      Yes 

 

 No

 

 

Instruction booklet & HETAS certificate handed to end user:   

Yes    

No

 

 
 
 

Signature:__________________________ Print Name:_________________________

 

Содержание Hereford 5

Страница 1: ...stallation Operating Instructions Covering Models Ignite 5 6 7 Desire 5 6 7 Q5 Q6 Q7 Standard Log Store Multifuel Stoves Tested to EN 13240 These appliances must be installed and commissioned by a HET...

Страница 2: ...tion Controls Layout 14 Controls Explained 15 Air wash System 15 Ash Pan 15 Recommended Fuels 16 Lighting the Stove Kindling Stage 17 Burning Wood Burning Coal 18 Warning Notes 19 Maintenance Door Adj...

Страница 3: ...elaws and other specifications or regulations as they affect the installation of the stove It should be noted that the Building Regulations requirements may be met by adopting the relevant recommendat...

Страница 4: ...e taken to avoid the possibility of personal injury CO Alarms Building regulations require that whenever a new or replacement fixed solid fuel or wood biomass appliance is installed in a dwelling an a...

Страница 5: ...1 81 1 83 4 Weight Kg Ignite 5 71 Ignite 5 LS 85 Desire 5 68 Desire 5 LS 82 Ignite 6 78 Ignite 6 LS 93 Desire 6 74 Desire 6 LS 90 Ignite 7 84 Ignite 7 LS 101 Desire 7 80 Desire 7 LS 97 Flue Diameter m...

Страница 6: ...Mar 14 GB Issue 3 6 Dimensions Ignite 5 Desire 5 Q5 Ignite 5 Desire 5 Log Store Q5 Log Store...

Страница 7: ...Mar 14 GB Issue 3 7 Dimensions Ignite 6 Desire 6 Q6 Ignite 6 Desire 6 Log Store Q6 Log Store...

Страница 8: ...Mar 14 GB Issue 3 8 Dimensions Ignite 7 Desire 7 Q7 Ignite 7 Desire 7 Log Store Q7 Log Store...

Страница 9: ...the stove for fuel to fall out a fender must be fitted if the hearth is flush with the carpet Clearances The stove requires the following clearances around it to ensure the heat is released into the...

Страница 10: ...ibly add a special cowl to the top of the chimney e g anti down draft cowl to eliminate wind induced down draft The outlet from the chimney should be above the roof of the building in accordance with...

Страница 11: ...g regulations approved document J for further information There must not be an extractor fan fitted in the same room as the stove as this can cause the stove to emit fumes into the room It is necessar...

Страница 12: ...to 1 To refit the internals follow the numbered sequence from 1 7 The firebricks should be fitted with the fibre paper on the LHS RHS and rear components the fibre paper should be sandwiched between...

Страница 13: ...ly It is possible to remove the stove from the store Log store versions this may be necessary for transport purposes The diagram below shows the locations of the fixings 4x bolts labelled 1 which hold...

Страница 14: ...ove is fitted with two air controls which need to be correctly operated in order to light and maintain a fire Both controls are situated below the ash lip of the stove as indicated on the diagram belo...

Страница 15: ...ake is adjustable throughout the area of travel in to out to control the total amount of air required for suitable combustion The Secondary air intake is used at initial start up and to control the bu...

Страница 16: ...smoke control areas Do NOT burn House coal or any other coal which are intended for use on open fires Suitable coal needs to be designed for use on closed appliances Open fires send a large amount of...

Страница 17: ...using the newspaper then add a generous amount of dry kindling in a criss cross pattern as shown below Stage 2 Ignite the paper underneath using a match or suitable fire lighter Allow the paper and ki...

Страница 18: ...ntrolled once again by the secondary control If you no longer want to keep the fire going simply allow it burn out Burning Coal With kindling complete you are now ready to add your approved coal Stage...

Страница 19: ...a flue pipe thermometer so that you can monitor how much heat you are sending up the chimney this will both enable efficient operation of your stove and also give a good indication if you are over fi...

Страница 20: ...n seal anticlockwise to loosen seal on both the top and bottom hinge this ensures that the door seal will compress or loosen evenly Re fit the door back onto the hinges and tighten the locking nut ins...

Страница 21: ...lint free cloth is normally sufficient however for stubborn build ups we would recommend using a very fine wire wool Chimney Sweeping It is essential that your chimney flue is swept at least once a y...

Страница 22: ...ce with regard to installing a Flue Draught Stabiliser The stove has been recessed into the existing fireplace and a lot of heat is being absorbed by the surrounding fireplace walls rather than being...

Страница 23: ...____________ Address _______________________________________________________________ Telephone Inc area code _________________________________________________ HETAS Registration Number _______________...

Страница 24: ...LHS and RHS baffle plate set 3 Rear Baffle 4 Top Baffle 5 Cast Grate 6 Cast grate front 7 Ash pan 8 Latch 9 Air box 10 Coal Slider 11 Wood Slider 12 Door Handle 13 Steel Door 14 Glass 15 Steel door G...

Страница 25: ...mpletion date SERVICE ENGINEER REG No COMPANY NAME COMPANY ADDRESS POSTCODE CONTACT NUMBER 4TH YEAR SERVICE completion date SERVICE ENGINEER REG No COMPANY NAME COMPANY ADDRESS POSTCODE CONTACT NUMBER...

Страница 26: ...its Replaced parts or components will become the property of Broseley Fires Should you wish to claim under the warranty please contact the supplier dealer from whom you purchased the appliance Do not...

Отзывы: