Operation & Installation Manual RFP V2 Series
MA225 Rev 1
26 of 50
To install EIB650iWX or EIB603CX, the following procedures can be used:
1)
Before installing EIB650iWX or EIB603CX to a zone, ensure the panel is fully
switched off and the panel battery is disconnected.
2)
Mount the interface card base assembly BAX16 to the ceiling and terminate
the field wiring according to the panel drawings shown in the Block Wiring
Diagram in Figure 12, page 37 and Figure 13, page 38.
Note: Interconnect
IN
/
OUT
must be terminated correctly i.e. from
RFP
to
IN
and
OUT
to the
next
BAX16 and so on. If
IN
/
OUT
are swapped, a fault will be generated.
3)
Connect the appropriate Smoke/ Heat Alarm head to BAX16 by plugging the
adapter board SUB1005 into the socket in the Alarm as shown in Figure 10.
Refer to Figure 9 for head removal.
•
Figure 10 Ribbon cable from SUB1005
4)
Select the DIP switch settings (see Table 5 on page 27) before powering the
panel ON.
5)
The panel should initialise and maintain in the normal state (Green LED
steadily lit) if everything is connected correctly.
6)
If the ribbon cable assembly is disconnected from an Alarm in a zone, the
panel should revert into fault state (refer to respective manuals in alarm head
for fault indications) and panel will chirp and also show a zone fault indication.
7)
If ANY changes to the DIP switch settings are to be made while the panel is
operating, please power down the panel first then set DIP switch. The panel
will reinitialise with the new settings.
Figure 11 Removing Alarm Heads from EIB603cX and/or EIB650iWX