Transit Precautions
To safeguard against damage during transit, transport the instrument to the
installation site in the same container used for transportation from the factory
if circumstances permit.
Installation
A. Location
For proper operation of the GT1600 flowmeter it must be mounted within
6 degrees of true vertical, with the inlet connection at the bottom of the
meter, and the outlet at the top. The use of a plumb-bob, level or other
device to assure vertical positioning is recommended.
B. Piping Arrangement
It is strongly recommended that the typical piping arrangement shown in
Figure 2-1, be used when installing the meter. This piping arrangement
permits the meter to be isolated from the flow for servicing or cleaning.
The design of the GT1600 flowmeter allows the horizontal inlet and outlet
end fitting to rotate independently of each other simply by loosening the
two clamp bolts for each end fitting at the rear of the meter. Additionally
the various end fittings offer horizontal or vertical connections or a
combination of both.
Figure 2-1 Typical Flowmeter Piping Configuration
A - Inlet Valve
B - O utlet Valve
C - Bypass Valve
D - Control Valve
E - Drain Valve
HO RIZO NTAL
LINE
D
A
E
C
VERTICAL
LINE
B
B
A
E
FLO W M ETER
C
D
FLO W M ETER
18
Содержание GT1600
Страница 10: ...Section 1 Figure 1 4 Dimensions GT1600 Series See Dimensions Tables on following pages 5...
Страница 18: ...Section 1 13 Figure 1 5 Reed Switch Alarm UL Installation...
Страница 21: ...Section 1 Figure 1 7 Dimensions and Specs Intrinsically Safe Switch Isolators 16...
Страница 26: ...Section 4 Overview 21...
Страница 29: ...Section 5 Figure 5 2 GT1600 Sizes 7 10 Parts Assembly Drawing Ref GT16XX002_1 24...