5
Maintenance:
1
.
The safety level of the equipment can be maintained only if it is examined
regularly for damage and wear, e.g. ropes, pulleys, connection points;
2
.
Pay special attention to components most susceptible to wear.
3
.
Replace defective components immediately and /or keep the equipment out
of use until repair;
4
.
This equipment should carry on regular maintenance according to the
following chart:
INSTALL SKETCH MAP
Let assembly become easier
All the content of user’s manual is to assured the strength training machine can be
installed more easily
Reading the details and instructions before installing:
1
.
Because the size and weight of equipment is so large, Please choose the installed
place near the desired station and assured there is enough space to exercise
2
.
All parts can be put on the clear area, then backout the wrapper. And the wrapper
can’t be through away before installation finished.
3
.
Screw the bolt tightly except the additional instruction
4
.
All parts must be installed according the illustration indication.
5
.
Installation work can be finished by two men
6
.
Identify all parts by part identify chart
Maintenance
Daily
Weekly
3 Months
Inspection:
The connection
part,pulley,match
restructuring
√
To clean: seat,
shield
√
Lubrication: need
lubrication part
√
Check
whether
the screw loose
√
Lubrication:
bearing parts
√
Содержание H-021
Страница 1: ...H 021 USE MANUAL SQUATR TACK...
Страница 5: ...4 MAX LOAD OF HOOKS 220kg MAXIMUM WEIGHT 150kg HOOKS...
Страница 7: ...6 EXPLODED PICTURE C27...