3
Insert a bolt (5) through one of the four holes in
the top of the post. Fasten an eyebolt (4), flat
washer (1), lock washer (2), and nut (3) to the bolt
(5) Inside the post. Repeat this process for the
three remaining holes. Figure 2.
I
N
-G
ROUND
P
OST
I
NSTALLATION
17
4
Place the grill bottom on top of the post with the
four eyebolts (4) protruding through the holes
located on the grill bottom.
Secure the grill bottom to the post by placing a
lock washer (2) and nut (3) onto each of the four
eyebolts (4). Figure 3.
F
IGURE
2
3
4
2
6
GRILL
BOTTOM
7
4
2
3
GRILL
BOTTOM
F
IGURE
3
5
Note: See grill Owner’s Manual for location of the
grill’s gas valve.
Arrange with the gas company to have a gas
supply piping system installed and connected to
the bottom end of the copper tubing (6). Figure 2.
Note: See label on grill for gas pressure
information. The gas supply piping system MUST
have a shutoff valve. The valve must remain in
the OFF position when the gas supply piping
system is not in use.
Gas leak tests should be completed as directed in
the grill Owner’s Manual.
Completely fill remaining hole with soil.
6
Attach the control housing using two #8 x 1/2
screws (11) or two plastic panel fasteners as
shown in Figure 4.
F
IGURE
4
8
9
Содержание AND P48
Страница 21: ...NOTES 19...