Once you have completed the preliminary installation preparations (refer to
Preliminary EIA rack mount installation steps
on page 138),
complete the following steps to install your router in a 2-post EIA rack.
1. Unpack the Open Frame EIA 310-D Rack Mount Kit. The following table provides you with a list of the kit components, and the
following figure shows you the contents.
TABLE 32
Open Frame EIA 310-D Rack Mount Kit contents
Part Number
Description
Quantity
42-1000452-01
Saddle
1
52-0000211-01
10-32 x 5/8 inch screws
14
52-1000141-01
12-24 x 1/2 inch screws
14
52-1000138-01
M6 x 12 mm screws
14
NOTE
Use the screws specified for the type of rack. Make sure you have the items listed in the previous table, and shown in
the following figure.
FIGURE 61
Open Frame EIA 310-D Rack Mount Kit contents
1.
Saddle
2.
10-32 x 5/8 inch screws
3.
12-24 x 1/2 inch screws
4.
M6 x 12 mm screws
2. Allow 35U in the rack to accommodate the router. Refer to the following figure for system alignment.
•
The saddle requires 1U of permanent space in the rack.
•
The router requires 33U of space in the rack, plus 1U temporary space above for installation.
Installing a Brocade MLXe Series-32 router
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-04
139
Содержание NetIron MLXe Series
Страница 8: ...Brocade NetIron MLXe Series Hardware Installation Guide 8 53 1004203 04...
Страница 12: ...Brocade NetIron MLXe Series Hardware Installation Guide 12 53 1004203 04...
Страница 20: ...Brocade NetIron MLXe Series Hardware Installation Guide 20 53 1004203 04...
Страница 192: ...Brocade NetIron MLXe Series Hardware Installation Guide 192 53 1004203 04...
Страница 270: ...Brocade NetIron MLXe Series Hardware Installation Guide 270 53 1004203 04...
Страница 286: ...Brocade NetIron MLXe Series Hardware Installation Guide 286 53 1004203 04...
Страница 292: ...Brocade NetIron MLXe Series Hardware Installation Guide 292 53 1004203 04...