Preparing the installation site
2
Preparing the installation site
Cabling infrastructure
NOTE
Ensure that the proper cabling is installed in the site. For information on cabling, refer to the
following sections in this guide:
•
“Attaching a management station”
•
•
Installation location
Before installing the device, plan its location and orientation relative to other devices and
equipment. Allow at least 3 inches of space at the front of the device for the fiber-optic and power
cabling. Also, allow a minimum of 3 inches of space between the sides and the back of the device
and walls or other obstructions.
Removing extra shipment screws (FSX and
FSX 800
only)
The FSX and
FSX 800
ship with two extra screws installed in the right side of the chassis. These
screws secure the fan tray, protecting it from damage during shipment. You must remove these
screws before installing the chassis.
shows the location of the screws.
To perform this task, you need a #2 Phillips-head screwdriver.
FIGURE 27
Removing the extra screws used for shipment
1
Shipping screws
1
Chassis front
Chassis rear
Содержание FastIron SX 1600
Страница 8: ...viii Brocade FastIron X Series Chassis Hardware Installation Guide 53 1001723 02 ...
Страница 96: ...68 Brocade FastIron X Series Chassis Hardware Installation Guide 53 1001723 02 Verifying proper operation 2 ...
Страница 114: ...102 Brocade FastIron X Series Chassis Hardware Installation Guide 53 1001723 02 Removing MAC address entries 4 ...
Страница 200: ...188 Brocade FastIron X Series Chassis Hardware Installation Guide 53 1001723 02 Detailed procedure A ...
Страница 204: ...192 Brocade FastIron X Series Chassis Hardware Installation Guide 53 1001723 02 Russia B ...