© Xena Networks – May 2022
1
Version 5.1
Xena Networks ApS
Gammel Lundtoftevej 1B, 2
nd
floor
2800 KGS Lyngby
Denmark
www.xenanetworks.com
Val-C12-2400G Chassis
Installation Guide
HOW TO INSTALL VALKYRIE TEST MODULES
Страница 1: ...Networks May 2022 1 Version 5 1 Xena Networks ApS Gammel Lundtoftevej 1B 2nd floor 2800 KGS Lyngby Denmark www xenanetworks com Val C12 2400G Chassis Installation Guide HOW TO INSTALL VALKYRIE TEST MO...
Страница 2: ...ve Bay 1 x 2 5 SATA Drive with Hot swap Environmental Operating Temperature 10 to 35 C Storage Temperature 30 to 70 C Humidity 8 to 90 non condensing Power AC Voltage 100 240 VAC Max watt 1800W Regula...
Страница 3: ...mounting the two finger screws 9 Replace the air flow cover by sliding it till it in place and securing the two finger screws on top 10 Position the restraining bar in place and screw the restraining...
Страница 4: ...he original Xena boxes for shipping including the polystyrene foam and anti static bags Recommendations For ports that are not in use keep dust caps mounted Do not cover the front or rear ventilation...
Страница 5: ...e installation steps outlined above are described in detail below Please refer to the relevant section STEP 1 Remove the top cover by unscrewing the two finger screws at the back of the chassis STEP 2...
Страница 6: ...works May 2022 6 STEP 3 Remove the air flow cover by unscrewing the two finger screws on top and sliding it backwards till it releases STEP 4 Remove the alignment bar by loosening the two finger screw...
Страница 7: ...2022 7 STEP 4 cont STEP 5 If you are installing a Thor or Freya module you would have received the module itself a blind board and a special single 12V cable replacing the 12V splitter cable included...
Страница 8: ...in and remove the bracket Please note that if you are installing a Thor or Freya module the module itself is taking up 2 slots You also need to reserve a slot to install blind board on the heat sink...
Страница 9: ...Xena Networks May 2022 9 STEP 6 cont Press the test module firmly but carefully into place do not force it and then fasten again with the screw from Step 3...
Страница 10: ...icture below shows a configuration with 4 high speed modules installed Slot 0 Thor 400G module Slot 2 Blind Board Slot 3 Thor 400G module Slot 5 Blind Board Slot 6 Thor 400G module Slot 8 Blind Board...
Страница 11: ...Xena Networks May 2022 11 Step 7 If needed see list on page 3 and 4 connect 12 V power cable Use delivered 12V cable...
Страница 12: ...May 2022 12 Step 8 Mount the alignment bar by mounting the two finger screws The alignment bar fixes the modules in place Please make sure the top of the module goes into the appropriate slot in the...
Страница 13: ...g it forward into place and securing the two finger screws on top STEP 10 Position the restraining bar in place and screw the restraining bar tightly in place If sideways adjustments of the modules ar...
Страница 14: ...Xena Networks May 2022 14 STEP 11 Remount top lid and fasten it with the two finger screws Do not operate the chassis without top lid...
Страница 15: ...Xena Networks May 2022 15...
Страница 16: ...t ticket https xenanetworks com support IMPORTANT ALWAYS REMOVE LONG TEST MODULES BEFORE SHIPPING To minimize the risk of damage please remove long test modules before transportation This includes any...