3 - INSTALLATION INSPECTION
3-1
Before operating unit, be sure installation
meets all requirements in the Installation
Manual provided with your unit.
Follow cleaning instruc-
tions as outlined in this
manual before operating the first time.
See section 9 - CLEANING.
•
A remote circuit breaker or fuse should
be installed in the main power supply
located in a path of exit and clearly iden-
tified.
•
To avoid splashing of hot liquid, unit
must be restrained to prevent tipping.
This can be done by installing the unit in
a battery of appliances, in an alcove or
with adequate ties.
•
See
Safety Relief Valve
under GET-
TING TO KNOW YOUR BROASTER
®
PRESSURE FRYER. DO NOT install unit
where traffic area’s are on either side or
in back of unit.
1800GH:
Electrical Grounding
Instructions - The Model
1800GH is equipped with a three-prong
(grounding) plug for your protection
against shock hazard and should be
plugged directly into a properly
grounded three-prong receptacle.
DO
NOT
cut or remove grounding prong
from this plug.
A gas shutoff valve,
installed in gas supply
line, should be located in a path of exit
and clearly identified.
Contact your local Broaster Company rep-
resentative for converting from one type of
gas to another.
broaster.com Manual #17269 8/13 rev 5/14
Содержание 1600
Страница 2: ......
Страница 4: ......
Страница 9: ......
Страница 11: ......
Страница 13: ......
Страница 14: ...4 GETTING TO KNOW YOUR BROASTER PRESSURE FRYER 4 1 Model 1600 broaster com Manual 17269 8 13 ...
Страница 15: ...4 2 Model 1800 broaster com Manual 17269 8 13 ...
Страница 19: ......
Страница 23: ......
Страница 41: ......
Страница 47: ......
Страница 49: ......
Страница 56: ......
Страница 57: ...The Broaster Company 2855 Cranston Road Beloit WI 53511 3991 608 365 0193 broaster com ...