background image

02 Oct 2020

Broadcom, the pulse logo, Connecting everything, Avago Technologies, Avago, the A logo, Symantec, the Symantec logo, the Checkmark logo, Blue Coat, and the Blue Coat 

logo are among the trademarks of Broadcom and/or its affiliates in the United States, certain other countries, and/or the EU. Copyright © 2020 Broadcom. All Rights Reserved. 

The term “Broadcom” refers to Broadcom Inc. and/or its subsidiaries. For more information, please visit 

www.broadcom.com

.

1 — Unpack the Server

           Unpack the shipping package for the server appliance and 

verify it includes the following:   

Symantec SA-SRVG8-20 or SA-SRVG8-40 server 

appliance (Dell PowerEdge R640 XL)

ReadyRails kit with Cable Management Arm (CMA)

Two C14 to C13 power cords

Enterprise Products Safety, Environmental, and 

Regulatory Information

 document

2 — Rackmount the Server

1. Locate the components for installing the ReadyRails:

Two A10 sliding rails (

1

)v

Two Velcro straps (

2

)

Four screws (

3

)

Four washers (

4

)

2. Install the rack rails, beginning with the left rail:

Fully extend the rear sliding bracket of the rail so that 

the rail is as long as possible (

1

).

Position the rail end piece labeled FRONT facing 

inward and orient the rear end piece to align with the 

holes on the rear rack flanges.

Push the rail straight toward the rear of the rack until 

the latch locks into place.

For the front end piece, rotate the latch outward and 

pull the rail forward until the pins slide into the flange, 

and release the latch to secure the rail in place (

2

).

Repeat the preceding steps to install the right rail.

WARNING! 

Before setting up your server appliance, follow the 

safety instructions included in the 

Safety, Environmental, and 

Regulatory Information

 document shipped with the server.

WARNING! 

To avoid injury, do not attempt to lift the server 

by yourself.

CAUTION! 

Observe the following cautions before proceeding:

The rack may fall over if allowed to become top-heavy. 

Load the rack from the bottom up with the heaviest 

components at the bottom.

Take adequate safety and grounding measures to avoid 

creating an electrical shock hazard and to prevent bodily 

injury.

Use Extended Power Performance (EPP) compliant power 

supply units (PSUs), indicated by the EPP label, on your 

server. For more information about EPP, see the 

Installation 

and Service Manual

 at 

dell.com/poweredgemanuals

.

NOTE: 

The illustrations in this document do not represent a 

specific server or system.

NOTE: 

The ReadyRails kit is compatible with square, 

unthreaded round, and threaded round hole racks.

NOTE: 

The documentation set for your server is available at 

dell.com/poweredgemanuals

. Make sure that you always 

check this documentation set for all the latest updates.

2

1

3

4

1

2

Security Analytics Gen14 Dell Server Quick Start Guide

SA-SRVG8-20, SA-SRVG8-40

Содержание Symantec SA-SRVG8-20

Страница 1: ... the rack until the latch locks into place For the front end piece rotate the latch outward and pull the rail forward until the pins slide into the flange and release the latch to secure the rail in place 2 Repeat the preceding steps to install the right rail WARNING Before setting up your server appliance follow the safety instructions included in the Safety Environmental and Regulatory Informati...

Страница 2: ...e hard mount captive screw under each latch and tighten each screw with a Phillips 2 screwdriver 2 To release the server from the rack lift the slam latches and slide the server out of the rack 5 To secure the rails to the rack for shipping or in unstable environments install the supplied screws in the rails For square hole racks install the supplied conical washer to the screw before installing t...

Страница 3: ... will mount the CMA SIDE A or SIDE B Install the CMA attachment bracket at the back of the slide rail with the corresponding SIDE A or SIDE B marking Align the holes on the bracket with the pins on the slide rail and push the bracket downward until it locks in place 4 Install the CMA At the back of the server fit the latch on the front end of the CMA on the innermost bracket of the slide assembly ...

Страница 4: ...only straight through Ethernet cables Category 5E cables or better are recommended for 1000Base T operation Category 6A cables are recommended for 10GBase T operation 1 Connect a USB keyboard to the server s front or rear panel USB port 2 Connect a VGA cable to the server s front or rear panel VGA port and connect the other end of the cable to a VGA monitor The VGA ports are not hot pluggable 3 Co...

Страница 5: ...r sends the license key and license seed file to the Symantec license server which generates the license file license tgz and returns it to the server which automatically reboots 4 If your server does not have Internet access do the following Click Download DS Seed to download the seed file dsseed tgz to your workstation On a workstation with Internet access go to license soleranetworks com Type t...

Отзывы: