53-1004106-15 Installation Guide
Brocade
®
X6-4 Director Hardware Installation Guide
Torque Requirements
Use the following torque settings when tightening screws that secure the rack mount kit and device to the rack.
Table 9: Torque Requirements for Mounting Screws
Screw Size
Torque
6-32 x .25 in. (.635 cm) Phillips screw
10 cm-kg (8.75 in.-lb)
10-32 x .63 in. (1.60 cm) Phillips screw
36.86 cm-kg (32 in.-lb)
Assembling the Rack Hardware
1. Determine how the device can be oriented in the rack so that the nonport side has access to intake air (cool).
2. Install clip or retainer nuts in the rack rail locations shown in the following figure.
These nuts will secure the 10-32 screws that mount the rack kit shelf and the device to the rack. For rails with round
holes, use clip nuts. For rails with square holes, use retainer nuts. Note that the following figure shows relative
positions for these nuts in the rack rails to mount the shelf and device. You may mount the shelf and device in 9U of
rack space higher or lower in the rack than shown.
Figure 4: Clip and Retainer Nut Locations on Rack Rails
1. Attaching clip nuts for round-hole rails
2. Clip or retainer nut locations for device
3. Clip or retainer nut locations for shelf
4. Retainer nut for rails with square hole
5. Rail
53-1004106-15
28
Содержание Brocade X6-4
Страница 208: ......