background image

E

3 - 7

1

2

B111

Ø6.0mm

B016

B014

RH

LH

Содержание Cleargreen BS5

Страница 1: ...r cables before drilling holes in the wall The wall fixings supplied may not be suitable for your installation You may need to source alternatives depending on the construction of the wall you are fixing to Follow each step in turn Care and Cleaning Do not use solvents or abrasive material or chemicals to clean the enclosure Only clean using soapy water and a soft cloth rinse thoroughly afterwards...

Страница 2: ...supplied Tools required SILICONE Ø6 0mm Ø2 8mm Four panel Bathscreen 88cm x 145cm BS5 ST4 40mm ST3 5 10mm B016 B014 B013 B012 B111 3x x 3 x 3 3x 1x B112 x 1 x 1 B114 1x B113 B114 B113 B112 B013 B111 B012 B016 B014 ...

Страница 3: ...E 3 7 1 2 B111 Ø6 0mm B016 B014 RH LH ...

Страница 4: ...profile is as close to the wall as possible Before securing the screen to the profile ensure that the gap between the screen and the bath is equal along its whole length 4 Ø2 8mm B012 B013 B112 B113 B114 a b c d e f Please follow this step if the optional water barrier is desired ...

Страница 5: ...E 5 7 5 24H ...

Страница 6: ...ollow the below steps to replace the bottom sealing strip 1 Fold the fourth glass as show below 2 Take out existing sealing strip 4 Insert the new sealing strip 5 Silicone both ends 24H 3 Remove the glue residual from the glass on both ends ...

Страница 7: ... 7 8 9 2 Loosen the screws 3 Disassemble the hinge 4 Take out the sealing strip 5 Apply some transparent lubricating oil onto the surface of sealing strip evenly with the sponge or soft cloth 6 Install the sealing strip back to the frame The sealing strip should be straight and even from the top to the bottom 7 Install the hinge 8 Tighten the screws 9 Put back the covers onto the frames ...

Отзывы: