background image

3

British Gas RD5 - 

User's

WINTER CONDITIONS - i.e. CH and DHW required

The boiler will fire and supply heat to the radiators but will give
priority to DHW on demand. The DHW preheat will operate as
described under "summer Conditions" during periods when there
is no call for CH.

SUMMER CONDITIONS - i.e. DHW only required

Set the CH external controls to OFF or turn the CH thermostat
knob (B) to minimum.   The boiler will fire when required, for a
short period of time, to maintain the DHW calorifier in a
preheated condition and whenever there is a demand for DHW.

Note. 

The pump will operate briefly as a self-check once every 24

hours, regardless of system demand.

Control of water temperature

DOMESTIC HOT WATER

The DHW temperature is limited by the boiler controls to 65

0

C maximum

at low draw-of rate, adjustable via the DHW thermostat knob (Y).

Additionally, the temperature can be controlled by the user via the
draw-off tap; the lower the rate the higher the temperature, and
vice versa.

CENTRAL HEATING

The boiler controls the central heating radiator temperature to a
maximum of 82

0

C, adjustable via the CH thermostat knob (B).

Approx. CH flow temperatures for the boiler thermostat settings are:

Knob Setting

Flow Temperature

C

F

Minimum

30

86

Maximum

82

180

To shut down the boiler

1. For short periods.  

Set the boiler on/off switch (A) to OFF.

2. For longer periods

Set the boiler on/off switch (A) to OFF. Switch the electricity
supply to OFF. For longer periods the entire system should be
drained, including the domestic hot water supply.

To relight the boiler

Repeat the procedure detailed in 'To light the boiler'.

In cases of repeated or continuous shutdown a CORGI registered
installer should be called to investigate and rectify the condition
causing this and carry out an operational test. Only the
manufacturers original parts should be used for replacement.

Minimum Clearances

Clearances of

: 165mm (6 

1/2

"

) above, 

100mm (4"

) below, 

5mm

(

1/4

"

) at the sides and 

450mm (17

 3/4

") at the front of the boiler

casing must be allowed for servicing.
The minimum front and bottom clearance allowed when built into
a cupboard is 5mm.

To light the boiler.  

(Refer to Frame 1)

If a programmer is fitted refer to the separate instructions for the
programmer before continuing.

1.

C

HECK

 

THAT

 

THE

 

ELECTRICITY

 

SUPPLY

 

TO

 

THE

 

BOILER

 

IS

 

OFF

.

2.

Set the boiler on/off switch (A) to off and both the DHW
thermostat knob (Y) and the CH thermostat knob (B) to max.

3.

Switch on the electricity supply to the boiler and check that all
external controls, e.g. programmer, room thermostat, etc. are on.

4.

Set the boiler on/off switch (A) to ON.

The mains on neon (C) will illuminate and the boiler will commence
the ignition sequence, first supplying heat to preheat the DHW and
then to the CH when required.

Operation

In normal operation the control LED display will show the codes:

 (Standby - no demand for heat)

   (DHW preheat)

(CH being supplied)

  (DHW being supplied)

During 

ignition the LED  will flash.

During 

normal running the LED will remain illuminated.

Note. 

If the boiler fails to light after 3 attempts the fault code    

will be displayed.

Press and hold the reset button (E) for 2 seconds then release.
The boiler will repeat the ignition sequence.  If the boiler fails to
light consult a CORGI registered installer.

THE LOG BOOK SHOULD BE COMPLETED AFTER

EACH SERVICE AND KEPT WITH THESE

INSTRUCTIONS.

All CORGI Registered Installers carry a CORGI ID card, and have a registration number.  Both should be
recorded in your 

Benchmark

 Log Book. You can check your installer by calling CORGI direct on 0156 372 300.

Legend

A.

Boiler on/off switch.

B.

CH thermostat knob.

C.

"Mains on" neon.

D.

Neon.

E.

Reset button.

Y.

DHW thermostat knob.

1

BOILER CONTROLS

A

C

Y

B

E D

LED display

Ecl

6056

Condensate

drain

Pressure

gauge

Содержание RD5

Страница 1: ...British Scottish Gas RD5 the high efficiency boiler High efficiency wall hung gas fired fanned flue combination boiler RD5 user s guide Householder s guide to central heating boilers ...

Страница 2: ...n interest and that of safety it is the law that this boiler must be installed by a CORGI registered installer in accordance with the above regulations Electricity Supply The appliance must be earthed Supply 230 V 50 Hz The fusing should be 3A Connection must be made in a way that allows complete isolation of the electrical supply such as a double pole switch having a 3mm 1 8 contact separation in...

Страница 3: ...t an operational test Only the manufacturers original parts should be used for replacement Minimum Clearances Clearances of 165mm 6 1 2 above 100mm 4 below 5mm 1 4 at the sides and 450mm 17 3 4 at the front of the boiler casing must be allowed for servicing The minimum front and bottom clearance allowed when built into a cupboard is 5mm To light the boiler Refer to Frame 1 If a programmer is fitte...

Страница 4: ...ondensate drain caused by debris or freezing can cause automatic shutdown of the boiler If freezing is suspected and the pipe run is accessible an attempt may be made to free the obstruction by pouring hot water over the exposed pipe and clearing any blockage from the end of the pipe If this fails to remedy the problem the assistance of a CORGI registered installer should be sought Escape of gas S...

Отзывы: