ENGLISH
OPERATION MANUAL
BRITEQ
®
5/95
BTX-BEAM 5R
OVERHEAD RIGGING
Important:
The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed
at least 50cm
from surrounding walls.
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
Before rigging make sure that the installation area can hold a minimum point load of 10times the device’s
weight.
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
Don’t cover any ventilation openings as this may result in overheating.
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
Installation:
1.
Fix the Truss hooks (1) to the Omega clamps with screw and locking nut.
2.
Fasten the omega clamps (2) on the bottom of the base by inserting quick-lock fasteners (3) into the holes
of the base and tighten fully clockwise.
3.
Hang the fixture on the truss (4) using the hooks and fasten the screws (5). Fasten the safety cable (6)
through the bottom of the base and over the support.
ELECTRICAL INSTAL ADDRESSING
Important: The electrical installation should be carried out by qualified personal only,
according to the regulations for electrical and mechanical safety in your country.
Electrical installation for two or more units in DMX-mode:
The DMX-protocol is a widely used high speed signal to control intelligent light equipment. You need to
“daisy chain” your DMX controller and all the connected units with a good quality balanced cable.
Both XLR-3pin and XLR-5pin connectors are used, however XLR-3pin is more popular because these
cables are compatible with balanced audio cables.
Pin layout XLR-3pin: Pin1 = GND ~ Pin2 = Negative signal (-) ~ Pin3 = Positive signal (+)
Pin layout XLR-5pin: Pin1 = GND ~ Pin2 = Negative signal (-) ~ Pin3 = Positive signal (+) ~ Pins4+5 not used.
To prevent strange behavior on the dmx units, due to interferences, you must use a
90Ω to 120Ω terminator at the end of the chain. Never use Y-splitter cables, this
simply won’t work!
Make sure that all units are connected to the mains.
Each unit in the chain needs to have its proper starting address so it knows which
Содержание BTX 5R BEAM
Страница 1: ......
Страница 2: ......
Страница 17: ...ENGLISH OPERATION MANUAL BRITEQ 15 95 BTX BEAM 5R ...
Страница 28: ...FRANÇAIS GUIDE D UTILISATION BRITEQ 26 95 BTX BEAM 5R ...
Страница 36: ...FRANÇAIS GUIDE D UTILISATION BRITEQ 34 95 BTX BEAM 5R ...
Страница 48: ...NEDERLANDS BEDIENINGSINSTRUCTIES BRITEQ 46 95 BTX BEAM 5R ...
Страница 56: ...NEDERLANDS BEDIENINGSINSTRUCTIES BRITEQ 54 95 BTX BEAM 5R ...
Страница 67: ...DEUTSCH BEDIENUNGSANLEITUNG BRITEQ 65 95 BTX BEAM 5R ...
Страница 75: ...DEUTSCH BEDIENUNGSANLEITUNG BRITEQ 73 95 BTX BEAM 5R ...
Страница 87: ...ESPAÑOL MANUAL DE INSTRUCCIONES BRITEQ 85 95 BTX BEAM 5R ...
Страница 94: ...ESPAÑOL MANUAL DE INSTRUCCIONES BRITEQ 92 95 BTX BEAM 5R ...
Страница 98: ......
Страница 99: ......