2
D
5
6
8
9
A
A
3
2
4
12.7” to
12.8”
(322mm to
325mm)
between
holes
Peel the protective film from the
front of each door panel.
Please note there may be superficial
marking on the back of each panel
due to the laser cutting process used
to ensure the panels are very
precisely made. This does not affect
the performance or life of the
aluminum in any way, or the
outward appearance of the finished
door.
1
Fit the grommet (a) to the centre
hole in one door panel.
Fit the countersunk screws (b) and
nuts (c) to the other door panel. The
screws fit through from the back
into the countersunk holes.
Fit a plastic rivet (d) to each channel
in the hole shown.
Tighten each nut by turning the
screw with a screwdriver whilst
holding the nut with pliers or a
spanner.
Locate the rivet in the hole, then
push it in to secure it.
7
The channels are fitted to the hen
house with the rivets at the bottom
of each channel, not nearer to the
top.
Position the channels on each side
of the door hole on the hen house
with the hole central between the
channels. They must be perfectly
vertical, flat and level. The fixing
holes must be 12.7” – 12.8” (322mm
– 325mm) apart.
b
c
a
d
Once the channels are vertical and
the holes 12.7” – 12.8” (322mm –
(325mm) apart, mark the locations
for the six fixings. Drill 1/16”
(1.5mm) diameter holes.