
Operating Procedures
Cage Unloading System
20
OPERATING PROCEDURES
VISUAL INSPECTION PRIOR TO OPERATION
1. The operator should visibly inspect the hanging belt to make certain the knee valve is not activated and no for-
eign objects or obstructions are between the belts, and there is not any damage to cause the belt to be unsafe.
2. Operator should also visually check all other belts for foreign objects, obstructions, or damaged parts that would
cause the system to be unsafe to operate.
3. The operator should visually check under and around the unloading system to make sure that nobody is on and/
or under it and/or inside the safety fence before attempting to energize the system.
4. During the visual inspection the operator should be aware of any oil leaks or damaged parts. If leaks or dam-
aged parts are found, they should be reported to the supervisor and/or the maintenance manager. The system
should not be operated until it has been repaired.
THE OPERATOR SHOULD ALWAYS BE AWARE OF ALL SAFETY
FEATURES, HOW THEY OPERATE AND REPORT TO THE SUPER-
VISOR ANYTIME ANYTHING IS FOUND TO BE UNSAFE.
Содержание Cage Unloading System
Страница 60: ...Schematics Cage Unloading System 60 SCHEMATICS...
Страница 61: ...Schematics Cage Unloading System 61 ELECTRICAL SCHEMATIC TRANSFER CHAIN 091 21967 01 DATED FEBRUARY 2019...
Страница 62: ......
Страница 63: ...Schematics Cage Unloading System 63 ELECTRICAL SCHEMATIC TRANSFER CHAIN 091 21967 01 DATED FEBRUARY 2019...
Страница 64: ......
Страница 66: ......
Страница 68: ......
Страница 70: ......
Страница 72: ......
Страница 74: ......
Страница 75: ...Schematics Cage Unloading System 75 HYDRAULIC SCHEMATIC CAGE UNLOADING SYSTEM WITHOUT WASHER 091 23900...
Страница 76: ......