INSTALLATION
19
FUEL SYSTEM SELECTION
The engine of your Home Standby Generator is factory
calibrated to run on natural gas (NG). It may also be operated
on liquid propane vapor (LP).
To configure the fuel system for LP use:
1.
LP fuel inlet pressure must be between 11 and 14 inches
water column.
2.
Set AUTO/OFF/MANUAL switch to
OFF
.
3.
Pull service disconnect from disconnect box.
4.
Remove 15 Amp fuse.
5.
Change main jet in fuel mixer following instruction sheet
provided in LP conversion kit.
6.
Reinstall 15 Amp fuse.
7.
Reinstall service disconnect in disconnect box.
8.
Set AUTO/OFF/MANUAL switch to
AUTO
.
9.
Reset exercise timer following instructions “Setting
Exercise Timer” on page 20.
The generator is now ready to operate automatically using LP
fuel. With a fixed main jet for LP gas, there is no need to
perform any engine adjustments for LP operation.
INITIAL START-UP
(NO LOAD)
Begin testing the generator without any electrical loads
connected, as follows:
1.
Set AUTO/OFF/MANUAL switch to
OFF
.
2.
Set generator’s main circuit breaker to
OFF
(open)
position.
3.
Install 15 Amp fuse in control panel.
4.
Set AUTO/OFF/MANUAL switch to
MANUAL
.
NOTE:
When the Home Standby Generator is started for the
very first time, it will require that air in the gaseous fuel lines
be purged. This may take a few minutes.
5.
DO NOT crank engine for more than 15 seconds, then
pause for 15 seconds to reduce heat in starter.
6.
Repeat process until engine starts.
7.
Listen for unusual noises, vibration or other indications
of abnormal operation. Check for oil leaks while the
engine runs.
8.
Let engine warm up for about five minutes to allow
internal temperatures to stabilize. Then, set generators
main circuit breaker to
ON
(or closed) position.
9.
Connect an RMS AC voltmeter and a frequency meter to
check generator output at load side of circuit breaker.
Voltage should be 230-240 Volts, frequency should be
62.0 - 62.5 Hz.
10. Check generator output between one generator
connection lug and neutral lug, then between other
generator connection lug and neutral lug. In both cases,
voltage reading should be between 115-120 Volts.
11. Set AUTO/OFF/MANUAL switch to
OFF
. Engine will shut
down.
AUTOMATIC OPERATION
SEQUENCE
The generator’s control panel houses a logic control circuit
board. This control board constantly monitors utility power
source voltage. Should that voltage drop below a preset level,
control board action will signal the engine to crank and start.
When utility source voltage is restored above a preset voltage
level, the engine is signaled to shut down.
The actual system operation is not adjustable and is
sequenced by sensors and timers on the control board, as
follows:
Utility Voltage Dropout Sensor
• This sensor monitors utility source voltage.
• If utility source voltage drops below 70 percent of the
nominal supply voltage, the sensor energizes a six second
timer.
• Once the timer has expired, the generator will start.
Utility Voltage Pickup Sensor
This sensor monitors utility power supply voltage. When that
voltage is restored above 80 percent of the nominal source
voltage, a time delay starts timing and the generator will go
to engine cool-down.
Engine Cool-down Timer
• When the load is transferred back to the utility power
source, the engine cool-down timer starts timing.
• The timer will run for about one minute, then the generator
will stop.
• Minimum generator run time is five minutes.
Содержание 40220
Страница 26: ...SCHEMATIC 26 SCHEMATIC ...
Страница 27: ...WIRING DIAGRAM 27 WIRING DIAGRAM ...
Страница 28: ...EXPLODED VIEW 28 EXPLODED VIEW MAIN UNIT ...
Страница 30: ...EXPLODED VIEW 30 EXPLODED VIEW ENCLOSURE ...
Страница 32: ...EXPLODED VIEW 32 EXPLODED VIEW CONTROL PANEL ...
Страница 60: ...NOTAS 60 ...
Страница 86: ...REMARQUES 86 ...
Страница 87: ...REMARQUES 87 ...