24-DVRS25NB(N)-2
25
INITIAL OPERATION
1.
Check that the appliance is properly vented and connected to the gas supply.
2.
Check that all external parts, such as door and faceplate are properly attached and
fastened.
3.
Do not operate this appliance with broken, cracked glass doors or without the door (s) in its
correct (and latched) position. Do not abuse the glass by either striking or slamming shut.
4.
Check that there are no fingerprints left on glass panels, as high temperature can bake
these prints on permanently.
FINAL INSTALLATION CHECK
Each Brigantia Gas Fireplace is checked and tested at the factory prior to being packaged and
shipped to our dealers and finally installed in your home. Brigantia recommends that before
leaving this unit with the customer, the installer must ensure that the appliance is firing
correctly and that the electrical system is in working order.
This will include:
1.
Perform leak tests of supply line, gas control valve, supply line from gas control valve and
pilot assembly.
2.
Clocking the appliance to ensure the correct firing rate (see page 19 of this manual).
3.
If required, adjusting the primary air to burner to ensure that the flame does not carbon or
soot.
4.
Check for proper operation including correct drafting.
As a reminder, a TAG is attached to all of our gas fireplaces. This TAG is located at the gas
control valve. See Fig 1.
Any alteration to the product that causes carboning or sooting that results in any
damage or requires cleaning is not the responsibility of the manufacturer.
ARCHGARD INDUSTRIES LTD.
*** INSTALLER ***
IMPORTANT NOTICE
ALL GAS AND ELECTRICAL CONNECTIONS
** MUST ** BE CHECKED AND TESTED AT
TIME OF INSTALLATION.
Fig 1.
Содержание 24-DVRS25NB-2
Страница 4: ...24 DVRS25NB N 2 4 RATING PLATE...
Страница 8: ...24 DVRS25NB N 2 8 APPLIANCE DIMENSIONS Surround Installed Surround Removed...
Страница 24: ...24 DVRS25NB N 2 24...
Страница 26: ...24 DVRS25NB N 2 26 LIGHTING INSTRUCTIONS ON RATING PLATE...
Страница 31: ...24 DVRS25NB N 2 31 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 33: ...24 DVRS25NB N 2 33 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 38: ...24 DVRS25NB N 2 38 CONVERSION KIT INSTRUCTIONS CONT VALVE CONVERSION...
Страница 44: ...ARCHGARD FIREPLACES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...