
Bridgeview Manufacturing Inc
.
FlexCart 48 Header Transport
5
Loading the Header
Always follow the specific instructions as laid out in the header manual, but in general:
•
Make sure the reel is fully down and in
•
Fully retract the gauge wheels
•
Make sure all guards and shields are properly closed and latched
•
Slowly align and lower the header onto the frame. Make sure all of the supports are properly
aligned as above.
•
Disconnect the header from the combine as per the specific header instructions. DO NOT
LOWER MORE THAN NECESSARY. This will put excess pressure on the trailer axles
which may cause damage.
•
ALWAYS ENSURE THAT NO ONE IS BETWEEN THE COMBINE AND THE TRAILER,
OR UNDERNEATH EITHER DURING THIS PROCESS.
•
Strap the header down to trailer at the provided tie-down points and ratchet strap. Ensure that
there are at least 2 wraps around the ratchet.
Securing the Load
•
Check all mounting brackets and straps for tightness. Replace any frayed or cut straps
•
Periodically inspect the strap tension on longer trips. Adjust as required.
•
Make sure all of the pins for the header mounting brackets are in place
•
Make sure there are no loose parts that can be blown out by the wind. All guards must be
closed.
Unloading the Header
•
Park the trailer on a hard flat surface. Leave connected to the tow vehicle with the parking
brake engaged.
•
Remove the tie down straps. They may be stored in the toolbox located inside the front beam
of the trailer
•
Connect to the combine as per the specific header manual
•
Slowly raise the header off the trailer frame. Make sure nothing is catching or rubbing.