background image

BREWBUILT.COM 

PAGE 3

K

F

G

E

D

J

H

I

A

L

F

G

N

O

P

M

F

G

R

B

C

Q

ASSEMBLING FOR ALL X1 CONICALS

FEET

Thread each foot into the bottom of the legs on the Conical leaving about half an inch of thread visible. Adjust as needed.

BLOW OFF

Place 1.5" TC gasket into the open blow off port on the conical lid and fasten the Blowoff U Barb with a 1.5" TC clamp, ensuring that the U 
Barb is pointing downward off the side of the conical. Slide ½" Silicone tubing over the barbed side of the U Barb. It’s easiest to start with 
one side and then work it around until barbs are fully covered. 

THERMOWELL

Place 1.5" TC Gasket and Thermowell into the open port in front of the conical just below the etched BrewBuilt Logo and 
fasten in place using 1.5" TC clamp.

SAMPLE VALVE 

Place 1.5" TC Gasket and Sample Valve into the open port halfway down the conical base on the front of the unit and fasten in place using 
1.5” TC clamp. Make sure the Sample Valve is closed by turning it clockwise until it stops.

BUTTERFLY VALVE

The Butterfly Valve opens in one direction, so be sure to install it so the valve handle opens downward away from the conical bottom. Place 
2" TC Gasket and Butterfly Valve on the bottom port of the conical and fasten in place using 2" TC clamp.

Содержание X1 Uni Pro

Страница 1: ... Important Safety Information PAGE 5 7 General Use Features PAGE8 Connecting the Control Panel PAGE8 SettingYourTemperatures BREWBUILT COM WARNING Read entire manual for important safety information before using your BrewBuilt X1 Uni Conical Fermenter Failure to follow warnings could result in serious injury or death ...

Страница 2: ...TC clamps make sure the gasket is seated properly into both flanges Once the gasket is in place loosen the clamp so it can be fitted around the flange ends You do not need to use any tools for leverage when tightening TC clamps Hand tightening is enough for a secure leak proof connection READ AND UNDERSTAND THIS FULL MANUAL Before your first use read through this full manual and make sure you unde...

Страница 3: ...e and then work it around until barbs are fully covered THERMOWELL Place 1 5 TC Gasket and Thermowell into the open port in front of the conical just below the etched BrewBuilt Logo and fasten in place using 1 5 TC clamp SAMPLE VALVE Place 1 5 TC Gasket and Sample Valve into the open port halfway down the conical base on the front of the unit and fasten in place using 1 5 TC clamp Make sure the Sa...

Страница 4: ...tself and into the lid until it is in the groove and equally distributed without stretch points Once you get the first piece of the gasket in the groove then you can use both hands to work the gasket around the lid and into the groove with your thumbs WARNING GASKET ORIENTATION Flat Side Into Lid Groove GASKET INSTALLATION With Lid Upside Down Push Flat End Of Gasket Into Lid Groove Improperassemb...

Страница 5: ...on chamber using GENERAL USE BREWBUILT COM PAGE 5 IMPORTANT SAFETY INFORMATION Please read this entire instruction manual for important safety information prior to the use of your BrewBuilt X1 Uni Conical Fermenter GENERAL PRECAUTIONS Follow all instructions and warnings provided with cleaning agents when cleaning and sanitizing Fermenter Do not pick up Fermenter when full it is heavy and the hand...

Страница 6: ...n to clog the blow off and airlock Do not place pellet hops whole hops oak chips or other items insulation and an AC unit The downside of these options is they require more space and take longer to cool since it s cooling the fermenting wort from the outside in Either way your BrewBuilt Conical comes with a Thermowell that allows you to insert the temperature probe from a temp controller which wil...

Страница 7: ... PRV will start releasing pressure around this point Never apply more than 15 PSI to your X1 TIP Filling your keg from the bottom up will keep splashing to a minimum as beer will flow down the beverage dip tube and gently fill the keg from the bottom up Lastly pull up the PRV ring on the keg and set it in the open position to allow air or CO2 if you pre purged the keg to escape as your fresh beer ...

Страница 8: ...nly go in one way Once aligned correctly they push in and rotate clockwise 1 4 turn to lock COOLING ON POWER UP SET DOWN HEATING ON FACTORY SETTINGS tS Set Point 68 CF Celsius Fahrenheit F CA Calibration Offset 0 Pt Compressor Delay 0 dS Differential 1 To change the settings hold the S button down till tS is showing about 5 seconds Using the up and down arrows find the setting you wish to check or...

Отзывы: