background image

22 

Ussc

BTU

(hr)(ft²)(°F)

W

(m²)(°K)

(Btu)(inch)

(hr)(ft²)(°F)

W

(m²)(°K)

BTU

(hr)(ft²)(°F)

(hr)(ft²)(°F)

BTU

(m²)(°K)

W

ALTERNATE FLOOR PROTECTOR CALCULATIONS

Alternate materials may be rated with C-factor (Thermal Conductance) or k-factor (Thermal Conductivity) ratings which must 

be converted to R-value to determine if the alternate material meets the tested requirements. The following instructions provide the 
proper information and formulas for conversion to R-value.

To determine if alternate materials are acceptable follow this sequence.
Convert material speci

fi

 cations to R-value:

a. R-value given — no conversion necessary
b. k-factor is given with a required thickness (T) in inches: R = 1/k x T
c. C-factor is given: R = 1/C
Determine the R-value of proposed alternate 

fl

 oor protector:

a. Use formulas in step 1 above to calculate R-value of proposed material(s).
b. For multiple layers, add R-values of each layer to determine overall R-value.
If the overall R-value of the 

fl

 oor protector system is equal to or greater than the 

fl

 oor protector speci

fi

 cations given, the alternate 

is acceptable.

De

fi

 nitions:

Thermal conductance (C) = 

 

=

Thermal conductivity (k) = 

 

 

=

Thermal resistance (R) = 

 

=

Example:
The specs of 

fl

 oor protector material should be 3/4-inch thick material with a k-factor of 0.84. The proposed alternative material 

is 4” brick with a C-factor of 1.25 over 1/8-inch mineral board with a k-factor of 0.29.

Step 1: 

Convert specs to R-value.

R = 1/k x T = 1/0.84 x 0.75 = 0.893 System must have a R-value of 0.893 = Rspecs

Step 2:

 Calculate R-value of individual components.

4” Brick with C-factor = 1.25. R = 1/C = 1/1.25 = 0.80 = Rbrick
1/8-inch (0.125”) mineral board with k-factor = 0.29. R = 1/0.29 x 0.125 = 0.431 = Rmin.brd.

Step 3:

 Add R-values of components to get total R-value of system.

Rmin.brd = 0.80 + 0.431 = 1.231 = Rsystem

Step 4:

 Compare Rsystem to Rspecs.

Rsystem = 1.231 is larger than Rspecs of 0.893. System R-value exceeds the required speci

fi

 cations and therefore is an acceptable 

alternative.

Содержание SWC31

Страница 1: ...is entire manual before you install or useyournewroomheater Failuretofollowinstruc tions may result in property damage bodily injury or even death Improper Installation Could Void Your Warranty CONFOR...

Страница 2: ...URNS DO NOT USE CHEMICALS OR FLUIDS TO IGNITE THE FIRE DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS SLIGHTLY OPENED DO NOT BURN GARBAGE FLAMMABLE FLUID SUCH AS GASOLINE NAPHTHA OR MOTOR OIL DO N...

Страница 3: ...nts required for your particular chimney installation For mobile homes see page 13 Assembly Flue Collar Assembly 1 Mount the flue collar to the top of the unit as shown using the 3 5 16 18 x 1 1 2 bol...

Страница 4: ...ION THE BLOWERASSEMBLY IS INTENDED FOR USE ONLY WITHASTOVE THAT IS MARKED TO INDICATE SUCH USE DO NOT ROUTE THE SUPPLY CORD NEAR OR ACROSS HOT SURFACES Step 1 Fix the assembly to the back of the stove...

Страница 5: ...H AIR INTO THE ROOM OR SPACE HEATED SHALL BE PROVIDED WHEN REQUIRED POSITIONING THE STOVE It is very important to position the wood stove as close as possible to the chimney and in an area that will f...

Страница 6: ...section of chimney connector the floor protector should go under it and 2 inches beyond each side To calculate R Values for alternative methods see ALTERNATE FLOOR PROTECTOR CALCULATIONS section in t...

Страница 7: ...nnector must not pass through an attic or roof space closet or similar concealed space a floor or a ceiling For Canadian installations where passage through a wall or partition of combustible construc...

Страница 8: ...nd of the section toward the chimney Any installation with a horizontal run of chimney pipe must conform to NFPA 211 You may contact NFPA National Fire Protection Association and request the latest ed...

Страница 9: ...the draft effect your stove s performance is directly dependent on an adequate draft from your chimney The following recommendations may be useful for the installation of your chimney 1 DO NOT CONNECT...

Страница 10: ...same manufacturer and install the ceiling support package or wall pass through and T section package firestops where needed insulation shield roof flashing chimney cap etc Maintain proper clearance t...

Страница 11: ...ssociation NFPA by having it inspected by a professional Make sure there are no cracks loose mortar or other signs of deterioration and blockage Have the chimney cleaned before the stove is installed...

Страница 12: ...r and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing fiber glass in...

Страница 13: ...ffer smoke roll out when opened or back drafts occur whether or not there is combus tion present 4 Opening a window slightly on a calm windless day alleviates any of the above symptoms 5 The house is...

Страница 14: ...conditions it may rot instead of drying This point cannot be over stressed the vast majority of the problems related to the operation of a wood stove is caused by the fact that the wood used was too d...

Страница 15: ...kindling wood inside the combustion chamber When you have achieved a good bed of hot embers we recommend the following burn procedures HEATING Controlled combustion is the most efficient technique fo...

Страница 16: ...nse in the relatively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flue lining When ignited this creosote makes an extremely hot fire The chimney connector...

Страница 17: ...o parts have been damaged in which case repairs must be performed immediately Inspect and clean the chimney and connector pipe periodi cally for creosote buildup or obstructions GLASS Inspect and clea...

Страница 18: ...Ventilate and vacate the room to avoid discomfort Once the curing is complete there will be no odor or smoke After re coating portions of your stove remember to follow the curing process as discussed...

Страница 19: ...Ussc 19 REPAIR PARTS Feed Door Assembly...

Страница 20: ...8 ID X 7 8 OD X 1 16 THK 2 9 83274 3 8 16 LK NUT BLACK 2 10 83508 5 16 18 X 3 4 BOLT 1 11 83431 WELD TAB 3 12 83432 5 16 18 X 1 1 2 HX HD C S PL 3 13 83338 5 16 18 LOCK NUT 1 14 25080 LATCH DOOR 1 15...

Страница 21: ...FULL MODEL NUMBER WHICH IS ON THE NAMEPLATE ATTACHED TO THE HEATER WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMA TION AS SHOWN IN THIS LIST 1 THE PART NUMBER 2 THE PART DESCRIPTION 3 TH...

Страница 22: ...layer to determine overall R value If the overall R value of the floor protector system is equal to or greater than the floor protector specifications given the alternate is acceptable Definitions Th...

Страница 23: ..._________ Reason for Purchase Alternative Heat Main Heat Source Decoration Cost Other _________________________ What was the determining factor for purchasing your new appliance _______ I have read th...

Страница 24: ...24 Ussc CUT HERE CUT HERE Fold Here Fold Here United States Stove Company P O Box 151 South Pittsburg TN 37380 Fold Here PLACE STAMP HERE...

Отзывы: